刷题
导入试题
【单选题】
What tool can capture network traffic at the uplinks, or vSwitch, or virtual port levels?___
A. tcpdump-uw
B. wireshark
C. pktcap-uw
D. pcap
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
C
解析
暂无解析
相关试题
【单选题】
Which storage feature always requires the use of third-party software on ESXi?___
A. Hardware Acceleration for NAS devices
B. VVOL
C. Hardware Acceleration for Block
D. evices
【单选题】
An ESXi host's VMCA-Signed certificate has expired. How can the certificate be renewed?___
A. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Renew button.
B. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Refresh CA Certificates button.
C. Run the command /sbin/generate-certificates on the affected host.
D. Disconnect the host from vCenter Server and reconnect it.
【单选题】
Which is the correct order for upgrading vSphere components?___
A. vCenter Server, ESXi hosts, VMware Tools, Virtual Machine hardware
B. VMware Tools, Virtual Machine hardware, ESXi hosts, vCenter Server
C. vCenter Server, Virtual Machine hardware, VMware tools, ESXi hosts
D. ESXi hosts, vCenter Server, Virtual Machine hardware, VMware Tools
【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
【单选题】
An administrator attempts to manually reclaim space on thin-provisioned VMFS6 volumes but finds that no additional space is being recovered. Which could be causing this?___
A. vSphere 6.5 does not support manual UNMAP.
B. The manual UNMAP operation has been moved to the vSphere web client.
C. The VASA version is use is incompatible.
D. UNMAP is automated for VMFS6.
【单选题】
An administrator has upgraded to vSphere 6.5 and also wants to use Kerberos authentication for NFS. Which can be done to the existing NFSv3 volumes to enable this feature?___
A. Perform a storage rescan on VMFS volumes.
B. Unmount the NFSv3 datastore, and then mount as NFSv4.1 datastore.
C. Nothing. All NFSv3 mounted datastores are upgraded automatically during vSphere upgrades.
D. Perform a scan of new storage devices.
【单选题】
An administrator wants to restore the vCenter Server Appliance 6.5 from backup. Where can this be accomplished?___
A. from the ESXi Host Client
B. from the VMware vSphere Appliance Management Interface
C. from within the VMware vSphere Web Client
D. from the vCenter Server Appliance Installer
【单选题】
The administrator wants to power on VM-K2, which has a 2GHz CPU reservation. VM-M1, VM-M2, and VM-K1 are all powered on. VM-K2 is not powered on. The exhibit shows the parent and child resource reservations. If Resource Pool RP-KID is configured with an expandable reservation, which statement is true?___
A. VM-K2 will be unable to power on because there are insufficient resources.
B. VM-K2 will be able to power on since resource pool RP-KID has 2GHz available.
C. VM-K2 will be unable to power on because only 2GHz are reserved for RP-KID.
D. VM-K2 will receive resource priority and will be able to power on this scenario.
【单选题】
Which is the block size on the VMFS6 datastore?___
A. All small and large file blocks are 8MB.
B. All small and large file blocks are 1MB.
C. Small file blocks are 512KB. large file blocks are 64MB.
D. Small file blocks are 1MB, large file blocks are 512MB.
【单选题】
When installing vCenter Converter Standalone, why must an administrator perform a client-server installation instead of a local installation?___
A. to manage conversion tasks remotely
B. to convert virtual machines as well as physical machines
C. to allow installation of the Converter agent on remote source machines
D. to hot clone physical or virtual machines
【单选题】
Which is required by vCenter Converter Standalone to convert a physical Red Hat Enterprise Linux 7 machine to a virtual machine?___
A. The Linux machine must be powered off.
B. The Linux machine must have the SSH daemon started.
C. The Linux machine must use a static IP address.
D. The Linux machine must have a fully-qualified domain name.
【单选题】
An administrator is troubleshooting network communications between a vCenter Server and an ESXi 6.5 host. Which log shows the related events between these components?___
A. /var/log/fdm.log
B. /var/log/vpxa.log
C. /var/log/hostd.log
D. /var/log/auth.log
【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
【单选题】
In vSphere Data Protection 6.1, which is the function of a Backup Verification job?___
A. None. Backup Verification job is not a feature of vSphere Data Protection
B. It is a manual task -Power it on -Verify the guest OS -Check started applications
C. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OS is booted by communicating with the Backup Verification agent
D. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OC is booted by detecting the VMware ToolsTM "heartbeats"
【单选题】
An administrator has enabled vSphere Distributed Switch Health Check. The hosts connected to that Distributed Switch all display an alert:< vSphere Distributed Switch MTU supported status > .The administrator has all of the VMkernel ports MTU sizes set to 1600. Which action will remedy this problem?___
A. Configure the Distributed Switch to MTU 9100.
B. Disconnect and reconnect the physical network cable.
C. Configure the physical switch to MTU 1600.
D. Disable the Distributed Switch MTU.
【单选题】
Which Host Profile Subprofile configuration is used to configure firewall settings for ESXi hosts?___
A. Advanced Configuration Settings
B. General System Settings
C. Security
D. Networking
【单选题】
Where would a vSphere administrator find general vCenter Server logs on a vCenter Server Appliance?___
A. /var/log/vmware/vpxd/
B. /var/log/messages
C. /etc/vmware-vpx/
D. /var/log/vmware/vsan-health/
【单选题】
An administrator wishes to enable network port mirroring based on source port. Which feature should be enabled?___
A. vSphere standard switch port
B. ERSPAN
C. NSX Virtual Wire
D. VLAN
【单选题】
Which CLI command shows the physical uplink status for a vmnic?___
A. esxcli network ip connection list
B. esxcli network ip neighbor list
C. esxcli network nic get
D. esxcli network nic list
【单选题】
Which is the maximum number of block devices (LUNs) that are supported by ESXi hosts that are running version 6.5?___
A. 1024
B. 512
C. 2048
D. 256
【单选题】
When performing a vCenter Server 5.5 for Windows with Microsoft SQL Server Express database migration to vCenter Server Appliance 6.5, which will be the target database?___
A. Microsoft SQL Server Express 2012R2
B. Microsoft SQL Server Standard 2012R2
C. PostgreSQL
D. Oracle DB 11g
【单选题】
An administrator has multiple vCenter Server 6.5 systems but cannot enable Storage I/O Control (SIOC) on a datastore shared by ESXi hosts managed by the vCenter Server systems. Which action should the administrator take to resolve the issue?___
A. Unmount the datastore and then enable SIOC on the vCenter Server system.
B. Configure the datastore to be managed by a single vCenter Server system.
C. Configure Storage DRS and then enable SIOC on the vCenter Server system.
D. Enable Raw Device Mapping (RDM) on the
E. SXi hosts.
【单选题】
“OneAppServer” is a VM template stored in a content library named “LibraryOne”, but the vSphere administrator is not able to use this template for deployment. Why is the administrator unable to deploy OneAppServer?___
A. OneAppServer must be updated before it can be deployed.
B. LibraryOne is a subscribed library and OneAppServer is not downloaded yet.
C. LibraryOne is published and optimized for syncing over HTTP.
D. OneAppServer was imported from a local file on the system.
【单选题】
An administrator sets the Failover Capacity for both CPU and Memory at 25%. Based on the Exhibit below, how much of the cluster’s total CPU resources are still available to power on additional virtual machines?___
A. 45%
B. 25%
C. 70%
D. 60%
【单选题】
Which statement applies to the vSphere Replication appliance?___
A. Only one vSphere Replication appliance can be deployed per vCenter Server instance.
B. VMware Tools in the vSphere Replication appliance can be upgraded.
C. A single vSphere Replication appliance can manage a maximum of 4000 replications.
D. vSphere Replication is available only with the vSphere
E. ssentials Plus license.
【单选题】
Which esxcli namespace can a vSphere Administrator use to adjust the queue depth?___
A. esxcli system module parameters
B. esxcli storage core device
C. esxcli system module set
D. esxcli storage core adapter
【单选题】
Which statement regarding datastore clusters meets VMware’s recommended best practices?___
A. Clusters should contain only datastores presented from the same storage array.
B. Clusters should contain only datastores with equal hardware acceleration capability.
C. Clusters should contain only datastores with the same capacity.
D. Clusters should contain only datastores using the same connection method (iSCSI, FC, etc.).
【单选题】
What VM Monitoring setting would ensure that the maximum reset window for a virtual machine is 24 hours?___
A. Medium
B. Low
C. High
D. Normal
【单选题】
What is the default space threshold for vSphere Storage DRS?___
A. 80%
B. 70%
C. 90%
D. 95%
【单选题】
Which is the correct sequence to upgrade a vSphere infrastructure?___
A. vCenter Server>ESXi host> VMware Tools>VM compatibility
B. ESXi host>vCenter Server> VMware Tools>VM compatibility
C. vCenter host> ESXi host> VM compatibility> VMware Tools
D. ESXi host>vCenter Server> VM compatibility>VMware Tools
【单选题】
An administrator has a large boot from SAN cluster and wants to ensure consistent configuration by using host profiles. What special considerations are required for boot from SAN hosts?___
A. Change the “Device is shared clusterwide” setting to “false” in the host profile.
B. Verify that the boot LUN is correctly identified as the boot device in the host profile.
C. The boot from SAN device must report as a local device.
D. Host profiles are incompatible with boot from SAN hosts.
【单选题】
When using VMware Converter to import a Windows server and improve the consistency of the destination virtual machine, which optional step can be performed immediately prior to powering down the source server?___
A. Perform a final synchronization task.
B. Remove the server from the network.
C. Uninstall production applications.
D. Remove the server from the Active Directory domain.
【单选题】
Restoration of the vCenter Server Appliance is accomplished using which interface?___
A. vSphere Web Client
B. vSphere Client
C. vCenter Server Appliance Management Interface
D. vCenter Server Appliance GUI Installer
【单选题】
When attempting to migrate a virtual machine to another host in the same cluster, the error message, “Select a valid compute resource” returns. What could cause this error?___
A. Both hosts run different versions of ESXi.
B. Both hosts are not sharing the same datastore.
C. VMware Tools is not installed.
D. Virtual machine has an ISO attached.
【单选题】
When will vSphere Data Protection delete the expired backup image of a Platform Service Controller?___
A. Immediately after the retention period has expired.
B. After the expired backup image is restored.
C. During the next backup window following expiry.
D. During the next maintenance window following expiry.
【单选题】
Group A has permission to download files in Content Library. Group B does not have permission to download files in Content Library. If a user is a member of both groups, what will be the result?___
A. The user cannot download file from Content Library.
B. The user can download file from Content Library.
C. The user cannot access Content Library.
D. The user can access Content Library.
【单选题】
An administrator is trying to set up Host Partial Failure Response, but the Automated option is grayed out. What can the administrator change to enable the Automated option?___
A. Change the vSphere DRS Automation level to Partially Automated.
B. Change the vSphere DRS Automation level to Fully Automated.
C. Enable vSphere HA Host Monitoring.
D. Change the vSphere DPM Automation level to Automatic.
推荐试题
【单选题】
A/O系统中的厌氧段与好氧段的容积比通常为___。
A. 1:2
B. 1:3
C. 1/4:2/4
D. 1/4:3/4
【单选题】
生化处理中,推流式曝气池的MLSS一般要求掌握在___。
A. 2~3g/L
B. 4~6g/L
C. 3~5g/L
D. 6~8g/L
【单选题】
A/O法中的A段DO通常为___。
A. 0
B. 2
C. 0.5
D. 4
【单选题】
通常SVI在___时,将引起活性污泥膨胀。
A. 100
B. 200
C. 300
D. 400
【单选题】
活性污泥法处理污水,曝气池中的微生物需要的营养比为___。
A. 100:1.8:1.3
B. 100:10:1
C. 100:50:10
D. 100:5:1
【单选题】
瞬时样只能代表采样___的被采水的组成。
A. 数量和时间
B. 数量和地点
C. 时间和地点
D. 方法和地点
【单选题】
二级城市污水处理,要求BOD5去除率___。
A. 50%左右
B. 80%左右
C. 90%左右
D. 100%
【单选题】
额定功率为1W,电阻值为100Ω的电阻,允许通过的最大电流为___。
A. 100A
B. 1A
C. 0.1A
D. 0.01A
【单选题】
发生火警时,如果电源没有切断,采用的灭火器材应是___。
A. 泡沫灭火器
B. 消防水龙头
C. 二氧化碳灭火器
D. 水
【单选题】
为保证设备操作者的安全,设备照明灯的电压应选___。
A. 380V
B. 220V
C. 110V
D. 36V以下
【单选题】
污水厂常用的水泵是___。
A. 轴流泵
B. 离心泵
C. 容积泵
D. 清水泵
【单选题】
8PWL型离心泵的叶轮属于___。
A. 敞开式
B. 封闭式
C. 半开式
D. 旋转式
【单选题】
M10中的M表示是___螺纹。
A. 普通
B. 梯形
C. 锯齿
D. 管
【单选题】
牛油盘根的基本材料是___。
A. 石棉
B. 棉纱
C. 尼龙
D. 人造棉
【单选题】
水体如果严重污染,水中含有大量的有机污染物,DO的含量为___。
A. 0.1
B. 0.5
C. 0.3
D. 0
【单选题】
用厌氧还原法处理污水,一般解决___污水。
A. 简单有机物
B. 复杂有机物
C. 低浓度有机物
D. 高浓度有机物
【单选题】
对于好氧生物处理,当pH___时,代谢速度受到阻碍。
A. 大于9.0
B. 小于9.0
C. 大于6.5,小于9.0
D. 小于6.5
【单选题】
___指硝酸盐被还原成氨和氮的作用。
A. 反硝化
B. 硝化
C. 脱氮
D. 上浮
【单选题】
通常传统活性污泥法易于改造成___系统,以适应负荷的增加。
A. 生物吸附
B. 阶段曝气
C. 渐减曝气
D. 完全混合
【单选题】
常用工业交流电的频率是___。
A. 10Hz
B. 20Hz
C. 50Hz
D. 100Hz
【单选题】
水泵润滑油一般工作___小时换一次。
A. 300
B. 400
C. 500
D. 600
【单选题】
悬浮物的去除率不仅取决于沉降速度,而且还与___有关。
A. 容积
B. 深度
C. 表面积
D. 颗粒尺寸
【单选题】
沉砂池前设置细格栅,其间隙宽度一般为___。
A. 5~10mm
B. 10~25mm
C. 25~30mm
D. 5~30mm
【单选题】
测定水中有机物的含量,通常用___指标来表示。
A. TOC
B. SVI
C. BOD5
D. MLSS
【单选题】
废水中各种有机物的相对组成如没有变化,那COD和BOD5之间的比例变化关系是___。
A. COD>BOD5
B. COD>BOD5 >第一阶段BOD
C. COD>BOD5 >第二阶段BOD
D. COD>第一阶段BOD>BOD5
【单选题】
离心泵主要靠叶轮高速旋转产生的___将水送出去。
A. 推力
B. 离心力
C. 外力
D. 向心力
【单选题】
运行记录填写错误需要更正时,必须采用___
A. 撕页重写
B. 用刀片刮去重写
C. 划改
D. 涂改
【单选题】
在工艺流程图中,下列符号表示活接头的是___
A.
B.
C.
D.
【单选题】
在工艺流程图中,表示法兰连接的符号是___
A.
B.
C.
D.
【单选题】
在工艺流程图中,表示闸阀的符号是___
A.
B.
C.
D.
【单选题】
在工艺流程图中,表示球阀的符号是___
A.
B.
C.
D.
【单选题】
带控制点的工艺流程图中,仪表控制点以___在相应的管路上用代号、符号画出。
A. 细实线
B. 粗实线
C. 虚线
D. 点划线
【单选题】
厂内行人要注意风向及风力,以防在突发事故中被有毒气体侵害,遇到情况时要绕行、停行、___
A. 顺风而行
B. 穿行
C. 逆风而行
D. 快行
【单选题】
ISO 14000系列标准的核心是___标准。
A. ISO 14000
B. ISO 14001
C. ISO 14010
D. ISO 14100
【单选题】
HSE管理体系是指实施安全、环境与___管理的组织机构、职责、做法、程序、过程和资源等而构成的整体。
A. 生命
B. 过程
C. 健康
D. 资源
【单选题】
建立HSE管理体系可提高企业安全、环境和健康___。
A. 管理水平
B. 操作水平
C. 使用水平
D. 能源水平
【单选题】
我国在国家标准管理办法中规定国家标准的有效期一般为___年。
A. 3
B. 4
C. 5
D. 7
【单选题】
2000版ISO 9000族标准适用的范围是___。
A. 小企业
B. 大中型企业
C. 制造业
D. 所有行业和各种规模的组织
【单选题】
依据《劳动法》规定,劳动合同可以约定试用期,试用期最长不超过___个月。
A. 12
B. 10
C. 6
D. 3
【单选题】
我国劳动法律规定,发动劳动争议时,提出仲裁要求的一发应当自劳动争议发生之日起___日内向劳动争议仲裁委员会提出书面申请。
A. 三十
B. 四十
C. 五十
D. 六十
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用