【判断题】
内战爆发后,客观形势决定了人民没有走中间路线的余地,原先主张走第三条道路的各党派都靠近了中国共产党,站到了新民主主义革命的立场上来。
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【判断题】
1949年9月的召开的中国人民政治协商会议,是新中国的创建会议,《共同纲领》起着临时宪法的作用。
【判断题】
民主党派参加新政协并在新中国参政,标志着民主党派地位的根本变化,它们不再是在野党,成为了中国人民民主专政的参加者。
【判断题】
人民民主专政的新中国的创建,标志着近代以来中国面临的两大历史任务的基本完成。
【单选题】
A vSphere content library administrator is attempting to unpublish the content library, but the option is grayed out as shown in the Exhibit. Which statement identifies the reason for not being able to unpublish? ___
A. The content library is optimized for syncing over HTTP.
B. A synchronization operation is in progress with this content library.
C. There are active subscriptions on this content library.
D. Underlying storage for this content library is not accessible.
【单选题】
Assuming a mirrored (RAID-1) object configuration, how many hosts must contribute storage in a non-stretched VMware vSAN cluster to satisfy the “Number of failures to tolerate” policy option?“n” is the desired “Number of failures to tolerate” value for all options.___
A. 2n+2
B. 2n
C. 2n+1
D. 3n
【单选题】
An administrator must change the statistics level for short-term performance monitoring and wants to collect metrics for all counters, excluding minimum and maximum rollup values. What would be the statistics level?___
A. Level 3
B. Level 1
C. Level 2
D. Level 4
【单选题】
In a vSphere environment, two resource pools are created as shown in the Exhibit. Each VM is configured with 1 GB of memory. When the administrator tried to power on VM3, the operation failed. What action in the resource pool settings will allow VM3 to power on successfully?___
A. Deselect Expandable Memory Reservation
B. Increase Memory Reservation
C. Deselect Expandable CPU Reservation
D. Increase the CPU Reservation
【单选题】
Which network is used by vSphere HA when VMware vSAN is enabled?___
A. Management network
B. vSphere Replication network
C. vMotion network
D. VSAN network
【单选题】
Which statement is correct when migrating from a Windows vCenter Server to the vCenter Server Appliance 6.5?___
A. Migration deployments do not migrate local OS users from the source vCenter Server.
B. Migration deployments support DHCP on the source vCenter Server.
C. Migration deployments allow the source vCenter Server to remain powered on afterwards.
D. Migration deployments support custom ports for all services on the source vCenter Server.
【单选题】
How can failback of a recovered virtual machine in vSphere Replication be performed?___
A. No action required, because failback is automatically performed to the source site.
B. Configure a new replication in the reverse direction at the target site.
C. Disable or Stop the virtual machine replication on the source site.
D. Power off and unregister the virtual machine on the target site.
【单选题】
After upgrading the vSphere infrastructure and VMware Tools to version 6.5, the “Upgrade VM Compatibility” option is grayed out in the vSphere Web Client. (See Exhibit.) What must the administrator do to enable the VM compatibility upgrade?___
A. VMware Tools should be upgraded last.
B. Restart the ESXi server.
C. Uninstall VMware Tools.
D. Power off the virtual machine.
【单选题】
What availability mode does vCenter HA provide?___
A. Active-Passive
B. Active-Standby
C. Active-Active
D. Load-balanced
【单选题】
In which scenario will vSphere DRS balance resources when set to Fully Automated?___
A. Hosts with only shared storage
B. Hosts are part of a vSphere HA cluster
C. Power Management is set to Balanced on hosts
D. Hosts with shared or non-shared storage
【单选题】
What VMware technology can be used to move physical servers to the vSphere infrastructure?___
A. VMware vMotion
B. VMware Converter
C. VMware vCenter Server
D. OVF transport
【单选题】
Upgrading vCenter Server with Microsoft SQL database fails with the following error message: The DB User entered does not have the required permissions needed to install and configure vCenter Server with the selected DB. Please correct the following error(s): %sWhat could cause this error?___
A. incorrect ports open on SQL Server
B. incorrect database on the SQL server
C. incorrect compatibility mode on the SQL server
D. incorrect permission on SQL Server database
【单选题】
What is a potential downside of having more than four paths per datastore?___
A. limits the storage protocols
B. increases storage latency for VM
C. limits the path selection policies
D. limits the number of LUNs per host
【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
【单选题】
What VM Monitoring setting would ensure that the failure interval for a virtual machine is defined as 120 seconds?___
A. High
B. Normal
C. Low
D. Medium
【单选题】
The business managers have asked the IT administrator to ensure configuration compliance in the vSphere infrastructure. The IT administrator wants to use Host Profiles to accomplish this, but is unable to do so. Why is the administrator unable to use Host Profiles?___
A. The infrastructure uses a vSphere Standard license.
B. The infrastructure has servers with various CPU families.
C. The user has only the “Administrator” role.
D. Host Profiles apply only to storage settings.
【单选题】
What is the result of a “Consolidate” action on a virtual machine?___
A. All snapshots on the virtual machines will be deleted.
B. The virtual machine will be reverted to its last snapshot.
C. Redundant delta disks will be combined and deleted.
D. A new snapshot with memory state will be created.
【单选题】
A Telco customer is implementing NFV using vSphere as the virtualization platform. Which feature can help achieve a high packet rate with lower CPU consumption?___
A. Network I/O Control
B. SplitRX
C. ERSPAN
D. LACP
【单选题】
What is the VMware-recommended best practice for Fibre Channel zoning?___
A. soft zoning
B. single-initiator-multiple-target zoning
C. single-initiator zoning
D. single-initiator-single-target zoning
【单选题】
How can a vSphere administrator ensure that a set of virtual machines run on different hosts in a DRS cluster?___
A. Use a VM-Host affinity rule.
B. Add the VMs to a vApp.
C. Use a VM-VM affinity rule.
D. Place the VMs in different folders.
【单选题】
vCenter Server Appliance Instance can be backed up using which Client Interface?___
A. vSphere Client Interface
B. vSphere Web Client Interface
C. VMware Host Client Interface
D. Virtual Appliance Management Interface
【单选题】
What tool can capture network traffic at the uplinks, or vSwitch, or virtual port levels?___
A. tcpdump-uw
B. wireshark
C. pktcap-uw
D. pcap
推荐试题
【单选题】
TCPI 等于 0.5 意味着 ( )。
A. 项目剩下的钱, 每一块钱只要完成 0.5 元的工作量, 项目就能够按既定预算完工
B. 项目剩下的钱, 每一块钱需要完成 2 元的工作量, 项目才能够按既定预算完工
C. 项目剩下的时间, 每天只要完成 0.5 天的工作量, 项目就能够按既定进度完工
D. 项目剩下的时间, 每天需要完成 2 天的工作量, 项目才能够按既定进度完工
【单选题】
对于固定资产, 每年提取等额的折旧数, 这是在采用 ( )。
A. 加速折旧法
B. 递减折旧法
C. 直线折旧法
D. 年数总和法
【单选题】
经过批准的、 按时间段分配的项目成本基准是 ( }。
A. 以资源直方图表现的累计成本计划
B. 以 S 曲线图表现的累计成本计划
C. 以控制图表现的累计成本计划
D. 以回归曲线表现的累计成本计划
【单选题】
在挣值管理中, 什么情况下使用 (BAC. EV ) / ( CPIxSPI ) 来计算完工尚需估算?( )
A. 成本超支且进度落后
B. 成本超支但进度提前
C. 成本节约但进度落后
D. 成本节约且进度提前
【单选题】
制定预算过程中的储备分析旨在 ( )。
A. 计算出项目的管理储备
B. 计算出项目的应急储备时间或应急储备成本
C. 监督项目中应急储备和管理储备的使用情况, 从而判断是否还需要这些储备, 或者是否需要增加额外的储备
D. 比较剩余的风险和剩余储备的匹配度
【单选题】
下列哪项不属于规划成本管理的输入? ( )
A. 进度管理计划
B. 风险管理计划
C. 项目章程
D. 风险登记册
【单选题】
制定预算过程的主要作用是 ( )。
A. 在整个项目中为如何管理项目成本提供指南和方向
B. 确定完成项目工作所需的资金成本
C. 确定项目成本基准
D. 发现实际与计划的差异, 以便采取纠正措施, 降低风险
【单选题】
以下哪个指标最可能在整个项目期间保持不变? ( )
A. ETC
B. BAC
C. EAC
D. TCPI
【单选题】
项目经理通常有权决定项目预算中的各种类型的开支, 除了 ( )。
A. 直接成本
B. 固定成本
C. 应急储备
D. 管理储备
【单选题】
完工估算是对以下哪项的定期估算? ( }
A. 已完成工作的成本
B. 已完成工作的价值
C. 项目完工时预期的总成本
D. 完成项目剩余工作的成本
【单选题】
挣得进度理论将如何测量进度偏差?( )
A. 挣值. 计划价值
B. 挣值/计划价值
C. 挣得进度. 实际时间
D. 挣得进度/实际时间
【单选题】
如果挣值是 300 000 美元, 实际成本是 3S5 000 美元, 计划价值是 370 000 美元, 项目的进度绩效指数是 ( )。
A. 0.85
B. 1.25
C. 1.16
D. 0.81
【单选题】
通常用货币单位来表示项目成本, 但有时也可用非货币单位, 以便 ( )。
A. 提高成本估算的准确性
B. 消除通货膨胀的影响, 便于成本比较
C. 更容易考核项目工作人员的业绩
D. 更容易把成本与进度结合起来考核
【单选题】
估 算 成 本 过 程 旨 在 ( )。
A. 对项目总成本做一个粗略的估算
B. 估算项目中各项活动的成本
C. 估算项目活动的直接成本
D. 估算项目活动的人工费
【单选题】
可以使用下列方法计算挣值, 除了 ( )。
A. 顺推计算法
B. 加权里程碑法
C. 固定公式法
D. 完成百分比法
【单选题】
以下哪项说明了项目已经完工?( )
A. EV = PV
B. EV = AC
C. EV = BAC
D. PV = BAC
【单选题】
关于粗略量级估算, 下列说法正确的是 ( )
A. 一般不使用这种方法估算成本
B. 项目信息比较详细时才可以开展的估算
C. 在项目初始阶段可以使用
D. 成本基准是粗略量级估算
【单选题】
以下哪项不是估算成本过程的输入? ( )
A. 成本管理计划
B. 质量管理计划
C. 项目进度计划
D. 资源管理计划
【单选题】
在项目执行过程中, 管理层批准动用管理储备金来应对已经发生的风险。 在这种情况下, 应该 ( )。
A. 修改成本基准
B. 修改项目预算
C. 修改项目资金需求
D. 增加项目应急储备
【单选题】
以下哪些内容包含在成本管理计划中?( )
A. 估算的准确度 、 成本绩效测量规则、 预先批准的项目总体预算
B. 估算的精确度、 筹资方案的说明、 资源的计量单位
C. 估算依据、 估算的准确度、 估算的精确度
D. 成本管理允许的偏差、 预先批准的项目总体预算、 成本绩效测量规则
【单选题】
下列哪个估算方法可以更准确地反映项目的实际成本? ( )
A. 参数估算
B. 类比估算
C. 自上而下估算
D. 自下而上估算
【单选题】
以下各项主要用于项目控制 , 除了 ( }。
A. 偏差分析
B. TCPI
C. 挣值分析
D. 质量成本
【单选题】
估算成本过程得到的成本估算, 通常包括 ( )。
A. 项目所使用的全部资源的成本
B. 直接成本和间接成本
C. 应急储备和管理储备
D. 以上都是
【单选题】
下列哪项是实际完成工作的预算价值? { )
A. 挣值( EV)
B. 计划价值 ( PV )
C. 实际成本 ( AC)
D. 成本偏差( CV)
【单选题】
制定预算过程的主要输入包括 ( )
A. 范围基准、 相关方登记册、 资源管理计划和组织过程资产
B. 成本估算、 范围基准、 项目进度计划和风险登记册
C. 成本估算、 质量基准、 项目进度计划和协议
D. 成本基准、 范围基准、 项目进度计划和风险登记册
【单选题】
公司要求你的项目必须在 5 个月内完成, 而且只有 100 万元预算, 这是 ( )。
A. 制约因素
B. 项目风险
C. 假设条件
D. 事业环境因素
【单选题】
以下哪项是对成本绩效指数的最准确的解释? ( )
A. 它表明成本超支或节约的情况
B. 它表明项目的成本绩效好坏
C. 它能够反映导致成本超支或节约的原因
D. 它表明单位成本所实现的项目价值
【单选题】
项目成本核算应该在什么时候进行? ( )
A. 成本发生时
B. 实际支付时
C. 实际交货时
D. 在上述各时间均可, 取决于组织的具体需要
【单选题】
可以利用历史数据之间的统计关系进行 ( )。
A. 三点估算
B. 类比估算
C. 自下而上估算
D. 参数估算
【单选题】
下列哪项不是估算成本过程的输入? ( )
A. 工作分解结构、 项目进度计划
B. 资源需求、 工作分解结构词典
C. 质量成本、 项目进度计划
D. 风险登记册、 项目进度计划
【单选题】
项目经理基于以往类似项目经验, 对项目成本开展估算, 准确度是 -25% ~ +75%。 他正在使用下列哪种成本估算方法?( )
A. 确定性估算
B. 三点估算
C. 类比估算
D. 参数估算
【单选题】
在制订成本管理计划的过程中, 项目团队不需要 ( )。
A. 征求成本管理专家的意见
B. 考察不同的项目融资方式
C. 召开成本规划会议
D. 考虑花多少钱去做质量管理
【单选题】
在编制项目预算时, 可以把各时点的累计成本基准确定为略高于预计的累计资金支出数, 以便 ( )。
A. 尽量拖延资金支出
B. 尽早取得资金投人
C. 更灵活地安排资金的使用
D. 考虑预计的债务
【单选题】
经过分析, 采用非节能材料可降低项目成本, 但是会导致项目投入运营后成本非常高。 项目团队应该 ( )。
A. 只关注完成项目成本最低, 不考虑项目成果的运营成本
B. 考虑项目决策对产品运营成本的影响后,再做出相应决策
C. 请运营部门决策是否使用节能材料
D. 按设计图纸执行
【单选题】
项目成本控制的重点是 ( )。
A. 分析资金支出与已完工作是否匹配
B. 监督资金的支出
C. 确保成本管理不超出批准的资金限额
D. 把成本超支控制在可接受范围内
【单选题】
下列哪项不属于估算依据中的内容? ( )
A. 估算是如何编制的
B. 对估算区间的说明
C. 用于绩效测量的挣值管理(EVM)规则
D. 关于全部假设条件和已知制约因素的文件
【单选题】
良好的成本管理可以确保 ( ) 0
A. 项目实际成本尽可能低于预算
B. 项目完工时的实际成本正好等于批准的预算
C. 项目在批准的预算内完工
D. 项目在批准的预算偏差 ± 10%内完工
【单选题】
项目最可能的成本是 1000 万元, 最乐观的成本是 800 万元, 最悲观的成本是 1400万元。 那么基于贝塔分布的预期成本是 ( )。
A. 1033 万元
B. 1067 万元
C. 1000 万元
D. 1100 万元
【单选题】
针对工期较长的大型项目,使用融资工具为项目分阶段获取资金,这是哪个管理过程的相关活动? ( )
A. 规划成本管理
B. 制定预算
C. 制定项目章程
D. 控制成本
【单选题】
下列哪项是资金限制平衡的作用?( )
A. 按已知的资金限制调整资金支出计划
B. 在资源需求与资源供给之间取得平衡
C. 增加资金投人, 满足项目的资金支出需要
D. 增加投人的资源以达到压缩工期的目的