【单选题】
What is the command for updating an ESXi host?___
A. esxcli software vib update –d /vmfs/volumes/Datastore/DirectoryName/PatchName.zip
B. esxupdate software update –d”/vmfs/volumes/Datastore/DirectoryName/PatchName.zip”
C. esxcli software update –d “/vmfs/volumes/Datastore/DirectoryName/PatchName.zip”
D. esxupdate software vib update –d /vmfs/volumes/Datastore/DirectoryName/PatchName.zip
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
A vSphere Administrator would like to identify which physical NUMA node their virtual machine is currently residing on. What esxtop metric would provide this information?___
A. GST_ND[x]
B. OVD_ND[x]
C. NRMEM
D. NHN
【单选题】
How can a vSphere administrator ensure that two virtual machines never run on the same datastore in a datastore cluster, while permitting the VMs to be load-balanced?___
A. Use an Intra-VM Anti-Affinity Rule.
B. Configure a storage DRS VM override.
C. Disable storage
D. RS for the VMs.
【单选题】
What is the VMware-recommended way to move a physical adapter out of Network I/O Control’s scope?___
A. Set the teaming policy to “Route Based on Physical NIC Load.”
B. Add the vmnic to the Net.NetNiocAllowOverCommit parameter in Advanced System Settings.
C. Add the vmnic to the Net.IOControlPnicOptOut parameter in Advanced System Settings.
D. Move the vmnic to a different vmUplink port on the Distributed Switch.
【单选题】
A VM folder contains VM1 and VM2. Group A has permission to power on virtual machines, defined on the VM folder and its children. Group B has permission to power off virtual machines, defined on the VM folder and its children. If a user is a member of Groups A and B, what will be the user’s effective permission on VM1 and VM2?___
A. Power on
B. Power off.
C. Power on and Power off.
D. Reset.
【单选题】
Group 1 is granted console interaction on a VM folder. User 1 is granted no console interaction on the same VM folder. What will be the outcome if User 1 tries to access the console of a virtual machine?___
A. User 1 will not be able to access the virtual machines in the VM folder.
B. User 1 will not have access to the virtual machine console.
C. User 1 will have access to the virtual machine console.
D. User 1 will have console access only via the vSphere Web Client.
【单选题】
Which statement is true regarding the use of VMFS3 datastores with vSphere 6.5?___
A. VMFS3 datastores can be used but not created.
B. VMFS3 datastores can be neither used nor created.
C. VMFS3 datastores will be present but unmounted.
D. VMFS3 datastores can be created and used.
【单选题】
In the Exhibit, each VM has a 1GHz non-expandable reservation. If all VMs are powered on in sequence, what would be the outcome?___
A. VM4 cannot be powered on.
B. VM5 cannot be powered on.
C. VM6 cannot be powered on.
D. VM3 cannot be powered on.
【单选题】
vSphere 6.5 introduced MAClearning capabilities for VMware’s virtual switches. What three benefits will it provide? (Choose three.)___
A. Reduced memory consumption.
B. Reduced consumption of extra CPU cycles.
C. Increased network throughput.
D. Prevent packet flooding inside the vSwitch.
【单选题】
What is the default pathing policy for most active-active arrays?___
A. Fixed
B. Most Recently Used
C. Dynamic
D. isk Morroring
【单选题】
Which command will show the iSCSI sessions on a ESXi 6.5 host?___
A. esxcli storage iscsi session get
B. esxcli iscsi session get
C. esxcli storage iscsi session
D. esxcli iscsi session list
【单选题】
Which of the following is not a parameter for traffic filtering or marking?___
A. virtual port ID
B. Protocol
C. Traffic Direction
D. DSCP value
E. Traffic redirection
【单选题】
A vSphere administrator wants to enable a virtual machine with Secure Boot, but in VM setting, Secure Boot option was not found under Boot Options. What could be the cause?___
A. The virtual hardware is not compatible.
B. The virtual machine has missing drivers.
C. The virtual machine OS does not support secure boot.
D. VMware Tools is not upgraded.
【单选题】
A virtual machine is connected on a distributed port group where the average bandwidth configured in the traffic shaping policy is 100 Mbps. The VM network adapter is configured with a reservation of 200 Mbps. What is the VM’s effective bandwidth?___
A. 200 Mbps
B. 100 Mbps
C. 150 Mbps
D. 400 Mbps
【多选题】
What are two reasons why a datastore in a Storage DRS cluster cannot enter maintenance mode?(Choose two.)___
A. Storage latency is too high to allow Storage DRS initiate Storage vMotion.
B. Storage DRS is configured for a VMFS3 datastore.
C. Storage
D. RS is disabled on the virtual disk.
【多选题】
What two methods are used to configure VMware vSphere Storage I/O Control shares and limits? (Choose two.)___
A. Assign shares and limits to VM virtual disks.
B. Assign shares and limits to datastores.
C. Assign shares and limits to Storage (DRS) clusters.
D. Assign shares and limits using VM storage policies.
【多选题】
ESXi 6.5 introduces VMFS6, which supports both 512e and 512n devices. What three configurations are supported when using these devices? (Choose three.) ___
A. Hosts with both 512e and 512n devices.
B. Storage vMotion between both 512e and 512n devices.
C. Datastore Extents spanned between both 512e and 512n devices.
D. Storage DRS clusters containing only both 512e and 512n devices.
【多选题】
A vSphere Administrator observes that the Primary VM configured with Fault Tolerance is executing slowly. After further investigation, it is determined that the Secondary VM is on an overcommitted ESXi host. What two methods will correct the problem? (Choose two.)___
A. Use Storage vMotion to migrate the Secondary VM to another datastore.
B. Use vMotion to migrate the Secondary VM to a different ESXi host.
C. Configure a CPU limit on the Primary VM which will also apply to the Secondary VM.
D. Turn off and turn on FT in order to recreate the Secondary VM on a different datastore.
【多选题】
Which two features require the use of Host Profiles? (Choose two.)___
A. Host Customizations
B. shared storage
C. Auto
D. eploy
【多选题】
What three processes on the vCenter Server Appliance (VCSA) does“vmware-watchdog monitor? (Choose three.) ___
A. vmware-eam
B. vmcad
C. vmware-vpostgres
D. vpxd
E. vsan-health
【多选题】
What three processes on the vCenter Server Appliance (VCSA) does“vmware-watchdog monitor? (Choose three.) ___
A. vmware-eam
B. vmcad
C. vmware-vpostgres
D. vpxd
E. vsan-health
【多选题】
Which two statements correctly describe VM-Host affinity rules? (Choose two.) ___
A. When there is more than one VM-Host affinity rule in a vSphere DRS cluster, the rules are applied equally.
B. After creating a VM-Host affinity rule, its ability to function in relation to other rules is predetermined.
C. When there is more than one VM-Host affinity rule in a vSphere
D. RS cluster, the rules will be ranked.
【多选题】
An administrator wants to enable proactive HA by moving virtual machines automatically if a hardware alert is triggered. What are the three required settings? (Choose three.)___
A. Set vSphere DRS Automation to Partially Automated.
B. Turn on Proactive HA.
C. Set the Proactive HA Automation Level to Manual.
D. Set the Proactive HA Automation Level to Automated.
E. Turn on vSphere HA and vSphere DRS.
【多选题】
If vCenter Server 5.5 installation has one or more services deployed remotely, which three services are relocated to vCenter Server 6.5 on upgrade? (Choose three.)___
A. vCenter Inventory Services
B. vSphere Authentication Proxy
C. vSphere Web Client
D. vSphere
E. SXi Dump Collector
【多选题】
What two debugging levels can a virtual machine be configured to? (Choose two.)___
A. Verbose
B. Debugging
C. Statistics
D. Trivia
【多选题】
What are three benefits of using a few large-capacity LUNs instead of many small-capacity LUNs? (Choose three.) ___
A. Better performance because there is less contention for a single volume.
B. More flexibility for resizing virtual disks.
C. Less wasted storage space.
D. More flexibility to create virtual machines without adding new LUNs.
E. Fewer VMFS datastores to manage.
【多选题】
Which two configurable options are available in Boot Options for a virtual machine? (Choose two.)___
A. Tools Upgrades
B. Encryption
C. Firmware
D. Force BIOS setup
【多选题】
Which three VMware-recommended best practices should an administrator follow before upgrading to vSphere 6.5? (Choose three.)___
A. Disconnect ESXi host from vCenter.
B. VMware Tools are installed in the virtual machine.
C. Ensure that the system hardware complies with ESXi requirements.
D. Back up the host.
E. Check the interoperability of any other software integrated with vSphere.
【多选题】
What are two requirements to enable EVC in vSphere DRS cluster? (Choose two.)___
A. CPUs must be from the same vendor.
B. EVC must use the lowest possible baseline supported by the hardware.
C. CPUs must be in the same family and of the same speed.
D. No VMs may be running in the cluster.
【多选题】
What three conditions could result in VMware Flash Read Cache being unable to claim a disk? (Choose three.)___
A. The disk is not listed in the VMware hardware compatibility guide.
B. The disk is not detected as an SSD.
C. The disk is not detected as local.
D. The disk is in use by VMFs.
【多选题】
Boot from SAN is supported on which three storage technologies? (Choose three.)___
A. VMware vSAN
B. FCoE
C. NFS 4.1
D. iSCSI
E. FC
【多选题】
Which two components are part of storage I/O multipathing on ESXi? (Choose two.)___
A. SATP
B. VASA
C. PSP
D. VAAI
【多选题】
Which two statements are true about Highly Available vSphere Auto Deploy infrastructure? (Choose two.)___
A. It helps prevent data loss.
B. It is a prerequisite for using vSphere Auto Deploy with stateful install.
C. It requires two or more Auto
D. eploy servers.
【多选题】
The virtual machine log rotation size can be changed for all VMs by which two interfaces? (Choose two.)___
A. PowerCLI
B. vSphere Web Client
C. ESXi host client
D. esxcli
【多选题】
Which two configuration options can exclude virtual disks from snapshot operations? (Choose two.)___
A. Use RDM in virtual mode for virtual disk.
B. Use virtual disks in Independent – Persistent mode.
C. Use a virtual disk larger than 2 TB in size.
D. Use RDM in physical mode for virtual disk.
【多选题】
Which two storage configurations on the source server are unsupported with VMware Converter? (Choose two.)___
A. Linux LVM
B. software RAID
C. GPT/MBR hybrid disks
D. Windows basic volumes
E. Windows dynamic volumes
【多选题】
Which two statements about vCenter HA are correct? (Choose two.)___
A. ESXi 5.5 or later is required.
B. vCenter HA network latency between nodes must be less than 50 ms.
C. NFS datastore is supported.
D. It must be deployed on a 3
E. SXi host cluster with DRS enabled.
【多选题】
An attempt to delete NFS datastore from a ESXi host returns the error: Sysinfo error on operation returned the following status:< Busy> Which two statements could explain this failure? (Choose two.)___
A. NFS datastore is a part of Storage DRS Cluster.
B. NFS.VolumeRemountFrequency value is set to 30.
C. Storage I/O Control is enabled on NFS datastore.
D. NFS datastore has running or registered virtual machines.
【多选题】
An administrator finds that the Microsoft Exchange virtual machines are exhibiting network latency. What two in-guest changes can help decrease latency? (Choose two.)___
A. LRO
B. TSO
C. SR-IOV
D. PVRDMA
【多选题】
Which two types of iSCSI adapters require VMkernel networking configuration? (Choose two.)___
A. dependent hardware
B. in-guest
C. software
D. independent hardware
【多选题】
Which two statements are true for NFS v4.1 firewall behavior? (Choose two.)___
A. It closes port 2049.
B. It sets allowed. All flag to TRUE.
C. It sets allowed. All flag to FALSE.
D. It opens port 2049.
推荐试题
【单选题】
现场施工各岗位人员必须保持良好的工作联系,用对讲机或其他通信方式联系工作时,信号不清晰时___随意判定信号内容。
【单选题】
钻机设备放置在边坡上施工,应采取措施防止滑落、翻倒,雨天施工时应有___。
A. 防滑措施
B. 防雨措施
C. 防范措施
D. 技术措施
【单选题】
生产管的焊(连)接过程应遵守相应的___。
A. 施工制度
B. 安全制度
C. 技术制度
D. 组织制度
【单选题】
施工单位应由___对工程质量进行检验,由建设单位、监理机构应对工程质量进行监督和检查。
A. 技术人员
B. 施工人员
C. 质检人员
D. 试验人员
【单选题】
铺设后管线纵、横断面位置应符合___.
A. 施工要求
B. 组织要求
C. 技术要求
D. 设计要求
【单选题】
定向钻铺设不同生产管___,应按符合相应管道的要求进行验收。
【单选题】
导向孔轨迹测量应采用导向仪随钻测控深度、顶角、方位角、工具面向角等___。
A. 基本数据
B. 基本参数
C. 基础数据
D. 基础参数
【单选题】
实钻导向孔轨迹应符合设计轨迹要求,偏差应在___允许范围内。
【单选题】
工程竣工验收应在___自检合格后进行,由建设、勘察、设计、监理、施工等单位共同参与完成。
A. 建设单位
B. 监理单位
C. 设计单位
D. 施工单位
【单选题】
定向钻铺管工程应严格执行现行的国家基本___。勘察工作是为设计和施工提供可行性依据。查明施工地段既有地下管线是为施工安全做保障。
A. 施工程序
B. 建设程序
C. 监理程序
D. 设计程序
【单选题】
定向钻铺管对使用的管材材质有严格要求,因此使用的___应符合国家有关现行标准及相关规定。
A. 施工质量
B. 技术水平
C. 管材质量
D. 技术要求
【单选题】
泥浆被称为定向钻施工的___。根据不同的地层条件,有针对性配制泥浆。施工过程中泥浆性能应随时监控和调整。泥浆的粘度、配浆用水的PH值及某些添加剂,应随着工程情况变化,随时加以改进、调整,所配制的泥浆应符合环保要求,安全防护,文明施工。
【单选题】
定向钻铺设地下管线为市政设施的一部分。___的周围地表、楼群、桥梁、公路、铁路、地下人防及其他地下管线等建筑物不能受到损坏。工程设计和施工都必须围绕着保证原建筑物安全的情况下进行。
A. 施工场地
B. 土建场地
C. 建筑物
D. 标志物
【单选题】
定向钻铺管是一个技术含量比较高的行业,所以对设计、施工、监理等单位的资质必须有严格的要求。对施工___也必须有严格的要求。
A. 技术人员
B. 操作人员
C. 施工人员
D. 监理
【单选题】
无论采用哪一种探测方法既有___都应在地面标志物、检查井、闸门井、仪表井、人孔、手孔中得到复核。
A. 地表起伏线
B. 钻孔的出如角
C. 地下管线
D. 断面图
【单选题】
___是收集资料和现场踏勘,进行工程地质的初步调查,对拟选线路方案的岩土工程条件作出初步评价。
A. 现场勘察
B. 技术交底
C. 定线勘察
D. 初步勘察
【单选题】
项目部安全员任职条件,持有省级政府部门颁发的安全管理人员安全生产考核合格证书和国家电网公司或___颁发的安全培训合格证书,具有从事2年及以上同类型工程施工安全管理经历
A. 地方安监局
B. 地方劳动稽查
C. 公司省级
【单选题】
___阶段是查明沿线工程地质、水文地质条件及环境对金属管道的腐蚀程度,提出设计参数,确定穿越线路。
A. 定线勘察
B. 初步勘察
C. 地质勘察
D. 现场勘察
【单选题】
___是确定穿越路由后,精确测量有关数据,绘制施工基本图件。
A. 剖面图
B. 断面图
C. 切面图
D. 施工图
【单选题】
优化穿越线路,在场地条件允许的情况下,应直线且垂直穿越障碍物,减少地下占用空间;在有利轨迹设计、施工的情况下降低___。
A. 设计费用
B. 施工费用
C. 工程造价
D. 施工造价
【单选题】
定向钻铺管施工设计应服从工程项目总体规划___要求。
【单选题】
项目部质检员任职条件,持有电力质量监督部门颁发的相应质量培训合格证书,具有从事___年及以上同类型工程施工质量管理经历。
【单选题】
施工图件及相关技术内容的___,是保证工程统一管理的重要措施。
A. 综合会审
B. 综合评审
C. 综合审计
D. 综合审查
【单选题】
定向钻铺设直径在___米以内的钢管多采用一定厚度的钢板先卷成圆筒,然后再焊接成型,最后再作圆。
A. 0.5
B. 1.0
C. 1.5
D. 2.0
【单选题】
钢管的强度主要指钢管产品公称___屈服强度。
【单选题】
___是指钢管材塑性变形和断裂过程中吸收的能量。
【单选题】
___是指钢材在一定的焊接工艺条件下,施焊和取得优质焊缝的难易程度,对管道抗腐蚀能力应有相应的要求。
A. 可焊性
B. 可融性
C. 韧性
D. 强度
【单选题】
定向钻铺设PE管的___包括:管材运输、焊接、铺设工艺的设计。
A. 施工内容
B. 设计内容
C. 敷设方式
D. 施工方式
【单选题】
定向钻铺管和开挖式直埋铺管的机理不同,要求所铺设的管线和建筑物及既有地下管线要有一定的___。
A. 高差
B. 垂直距离
C. 安全间距
D. 水平距离
【单选题】
扩孔的目的是将___扩大至能容纳所要铺设的生产管线大小要求,最终扩孔直径大小应根据地层条件和生产管道类型确定。
【单选题】
为保证扩孔工序正常开展,提倡按照设备制造商提供的___直径大小的扩孔钻头逐级扩孔。
【单选题】
为使生产管能顺利拉入孔内,管道的入土角和导向孔钻杆的出土角应___,避免两角度相左,造成刮孔和增大摩擦力。
A. 不一致
B. 相一致
C. 相同
D. 不同
【单选题】
为确保___过程顺利进行,应采取三条措施:清理一遍(或多遍清理)钻孔,使孔内保持通畅;抓紧时间、一气呵成;检修保养机具,处于最佳运作状态。
【单选题】
开挖生产管入孔的___或设置钢托架都是使管道能顺利进入孔内。
A. 扩孔
B. 出土角
C. 入土角
D. 发送沟
【单选题】
电气操作人员(电工)应穿戴由绝缘材料制成的___(最小)的电力工人靴和手套。
A. 20KV
B. 30KV
C. 40KV
D. 50KV
【单选题】
施工人员不应穿过于宽松的衣、裤、鞋、帽、手套,以免被机器卷入或牵绊;上岗必须佩戴___。
A. 工作证
B. 安全帽
C. 工作服
D. 绝缘靴
【单选题】
合理安排电缆段长,尽量减少电缆接头的数量,严禁在变电站电缆夹层、出站沟道、竖井和___米及以下桥架等区域布置电力电缆接头。
【单选题】
___电缆非开挖定向钻拖拉管两端工作井不宜布置电力电缆接头。
A. 10kV
B. 35kV
C. 110kV
D. 220kV
【单选题】
电缆通道及直埋电缆线路工程应严格按照相关标准和设计要求施工,并同步进行___,非开挖工艺的电缆通道应进行三维测绘。应在投运前向运维部门提交竣工资料和图纸。
A. 施工验收
B. 设计验收
C. 竣工验收
D. 竣工测绘
【单选题】