【多选题】
Which two configurable options are available in Boot Options for a virtual machine? (Choose two.)___
A. Tools Upgrades
B. Encryption
C. Firmware
D. Force BIOS setup
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which three VMware-recommended best practices should an administrator follow before upgrading to vSphere 6.5? (Choose three.)___
A. Disconnect ESXi host from vCenter.
B. VMware Tools are installed in the virtual machine.
C. Ensure that the system hardware complies with ESXi requirements.
D. Back up the host.
E. Check the interoperability of any other software integrated with vSphere.
【多选题】
What are two requirements to enable EVC in vSphere DRS cluster? (Choose two.)___
A. CPUs must be from the same vendor.
B. EVC must use the lowest possible baseline supported by the hardware.
C. CPUs must be in the same family and of the same speed.
D. No VMs may be running in the cluster.
【多选题】
What three conditions could result in VMware Flash Read Cache being unable to claim a disk? (Choose three.)___
A. The disk is not listed in the VMware hardware compatibility guide.
B. The disk is not detected as an SSD.
C. The disk is not detected as local.
D. The disk is in use by VMFs.
【多选题】
Boot from SAN is supported on which three storage technologies? (Choose three.)___
A. VMware vSAN
B. FCoE
C. NFS 4.1
D. iSCSI
E. FC
【多选题】
Which two components are part of storage I/O multipathing on ESXi? (Choose two.)___
A. SATP
B. VASA
C. PSP
D. VAAI
【多选题】
Which two statements are true about Highly Available vSphere Auto Deploy infrastructure? (Choose two.)___
A. It helps prevent data loss.
B. It is a prerequisite for using vSphere Auto Deploy with stateful install.
C. It requires two or more Auto
D. eploy servers.
【多选题】
The virtual machine log rotation size can be changed for all VMs by which two interfaces? (Choose two.)___
A. PowerCLI
B. vSphere Web Client
C. ESXi host client
D. esxcli
【多选题】
Which two configuration options can exclude virtual disks from snapshot operations? (Choose two.)___
A. Use RDM in virtual mode for virtual disk.
B. Use virtual disks in Independent – Persistent mode.
C. Use a virtual disk larger than 2 TB in size.
D. Use RDM in physical mode for virtual disk.
【多选题】
Which two storage configurations on the source server are unsupported with VMware Converter? (Choose two.)___
A. Linux LVM
B. software RAID
C. GPT/MBR hybrid disks
D. Windows basic volumes
E. Windows dynamic volumes
【多选题】
Which two statements about vCenter HA are correct? (Choose two.)___
A. ESXi 5.5 or later is required.
B. vCenter HA network latency between nodes must be less than 50 ms.
C. NFS datastore is supported.
D. It must be deployed on a 3
E. SXi host cluster with DRS enabled.
【多选题】
An attempt to delete NFS datastore from a ESXi host returns the error: Sysinfo error on operation returned the following status:< Busy> Which two statements could explain this failure? (Choose two.)___
A. NFS datastore is a part of Storage DRS Cluster.
B. NFS.VolumeRemountFrequency value is set to 30.
C. Storage I/O Control is enabled on NFS datastore.
D. NFS datastore has running or registered virtual machines.
【多选题】
An administrator finds that the Microsoft Exchange virtual machines are exhibiting network latency. What two in-guest changes can help decrease latency? (Choose two.)___
A. LRO
B. TSO
C. SR-IOV
D. PVRDMA
【多选题】
Which two types of iSCSI adapters require VMkernel networking configuration? (Choose two.)___
A. dependent hardware
B. in-guest
C. software
D. independent hardware
【多选题】
Which two statements are true for NFS v4.1 firewall behavior? (Choose two.)___
A. It closes port 2049.
B. It sets allowed. All flag to TRUE.
C. It sets allowed. All flag to FALSE.
D. It opens port 2049.
【多选题】
A vSphere Administrator attempts to enable Fault Tolerance for a virtual machine but receives the following error: Secondary VM could not be powered on as there are no compatible hosts that can accommodate it. What two options could cause this error? (Choose two.)___
A. The other ESXi host(s) are in Maintenance Mode.
B. Hardware virtualization is not enabled on the other ESXi host(s).
C. The other ESXi host(s) are in Quarantine Mode.
D. Hardware MMU is enabled on the other
E. SXi host(s).
【多选题】
Storage capabilities be populated in what two ways? (Choose two.)___
A. The administrator can use tags to describe capabilities.
B. Default capabilities are provided by vCenter Server.
C. Datastores can advertise their capabilities through VAAI.
D. Datastores can advertise their capabilities through VASA.
【多选题】
In network troubleshooting it is important to know what upstream switch the ESXi host is connected to. Which two features does ESXi provide to help identify the upstream switch? (Choose two.)___
A. Promiscuous mode
B. DPM
C. LLDP
D. CDP
【多选题】
Virtual Volumes supports which three VMware features? (Choose three.)___
A. Instant Clones
B. Distributed Resource Scheduler
C. Linked Clones
D. vMotion
E. Storage Distributed Resource Scheduler
【多选题】
vSphere DRS helps to balance virtual machines with available resources in a vSphere cluster. What three types of resources can be taken into account for balancing? (Choose three.)___
A. CPU
B. physical NIC saturation of an ESXi host
C. virtual NIC saturation of a virtual machine
D. RAM
E. storage latency
【多选题】
Which three design requirements must be satisfied to enable RAID-6 objects in a VMware vSAN cluster? (Choose three.)___
A. vSAN Advanced license or higher
B. vSAN stretched cluster
C. at least six hosts contributing storage
D. deduplication and compression
E. all flash configuration
【多选题】
When using "Cluster resource percentage" for host failover capacity in vSphere HA Admission Control, the total resource requirements are calculated from which two values? (Choose two.)___
A. Total vCPUs assigned to each VM.
B. Average CPU usage on each VM over time.
C. Memory reservations on each VM.
D. Total memory assigned to each VM.
E. Average active memory on each VM over time.
F. CPU reservations on each VM.
【多选题】
Which are four attributes of the Active vCenter HA node? (Choose four)___
A. It uses the vCenter HA network to communicate with the Witness node.
B. It constantly replicates vPostgres data with the Witness node.
C. It uses a public IP address for the management interface.
D. It runs the active vCenter Server Appliance instance.
E. It uses the vCenter HA network for replication of data to the Passive node.
F. It provides a quorum to protect against split-brain situations.
【多选题】
Which are two vCenter Server two-factor authentication methods? (Choose two.)___
A. RSA SecurID
B. Smart Card
C. SAML
D. Symantec VIP
【多选题】
An administrator is creating VMkernel adapters on an ESXi 6.5 host and wants to create separate VMkernel adapters for every type of traffic in the default TCP/IP stack. Which three types of traffic can be explicitly enabled on a separate VMkernel adapter? (Choose three.)___
A. Virtual SAN traffic
B. NFS traffic
C. vMotion traffic
D. vSphere HA traffic
E. Fault Tolerance logging traffic
【多选题】
When migrating a Windows vCenter Server 6.0 to the vCenter Server Appliance 6.5, which two will be migrated by default? (Choose two.)___
A. Local Windows OS users and groups
B. Configuration
C. Custom ports
D. FQDN
E. Historical and Performance data
【多选题】
Which three types of Content Libraries exist within vSphere 6.5? (Choose three.)___
A. Remote Content Library
B. Published Content Library
C. Local Content Library
D. Shared Content Library
E. Subscribed Content Library
【多选题】
An administrator cannot enable multi-processor Fault Tolerance (SMP-FT) for a virtual machine. Which are two possible causes for this? (Choose two.)___
A. The virtual machine is running on a vSAN datastore.
B. The Fault Tolerance network is using a 10Gbit uplink.
C. The virtual machine has 6 vCPUs assigned.
D. The virtual machine has a 1TB VMDK attached.
E. The virtual machine has snapshots present.
【多选题】
Which two statements are true for Predictive DRS? (Choose two.)___
A. It balances resource utilization for virtual machines with unpredictable utilization patterns.
B. It integrates DRS with vRealize Operations Manager to balance workloads for virtual machines before resource utilization spikes occur.
C. It balances resource utilization based on a threshold's algorithm that runs each night.
D. It determines the best placement and balance of virtual machines based on a threshold's algorithm that runs each night in vCenter Server 6.5 Database.
【多选题】
Which two situations could cause a virtual machine to appear with (orphaned) appended to its name? (Choose two.)___
A. if a host failover is unsuccessful
B. if a virtual machine was removed from vCenter Server's inventory
C. if a virtual machine was deployed from template, and the template has been deleted
D. if a virtual machine is unregistered directly on the host
【多选题】
Which three requirements are needed to apply RAID 5 or RAID 6 erasure coding on a vSAN 6.2 or 6.5 object? (Choose three.)___
A. on Disk Format 3.0
B. Hybrid vSAN
C. All Flash vSAN
D. vSAN Advanced License
E. Stretched Cluster Configurations
【多选题】
An administrator sees the following error in the log files: Which two events could be the source of the error message? (Choose two.)___
A. vCenter Server failure
B. VXLAN failure
C. Disk array failure
D. Network failure
E. ESXi host failure
【多选题】
An administrator is attempting to access an ESXi host via the DCUI but is unable to do so. Which could be two possible causes? (Choose two.)___
A. The host in Qhas no out-of-band management capability (i.e. iLO/iDRAC).
B. The SSH service is disabled on the host.
C. Strict lockdown mode is enabled on the host.
D. Normal lockdown mode is enabled and the administrator is a member of the
E. xception User list.
【多选题】
Which two permissions are required to migrate a virtual machine with Storage vMotion? (Choose two.)___
A. Network > Move Network
B. Virtual Machine > Inventory > Move
C. Resource > Migrate powered on virtual machine
D. Datastore > Allocate Space
【多选题】
Which are three supported storage requirements for vCenter Server HA? (Choose three.)___
A. NFS
B. RDM
C. vSAN
D. VMFS
E. JBOD
【多选题】
Which are the two network requirements for a VMware vSAN 6.5 cluster? (Choose two.)___
A. Multicast must be enabled on the physical switches and routers that handle vSAN traffic.
B. vSAN requires IPv6 only.
C. All hosts must have a dedicated 40GbE NIC.
D. The vSAN network supported IPv4 or IPv6.
E. vSAN requires IPv4 only.
【多选题】
Which three prerequisites must be in place prior to enabling secure boot for a virtual machine? (Choose three.)___
A. VirtualMachine.Config.Settings privileges
B. an encrypted USB drive
C. Virtual Hardware version 13 or later
D. Virtual Hardware version 12 or later
E. EFI firmware
【多选题】
A user is given the "Virtual machine user (sample)" role in a vSphere 6.x environment. Which three permissions would the user be able to perform? (Choose three.)___
A. Reset a virtual machine.
B. Power on a virtual machine.
C. Move a host into a cluster.
D. Configure CD media.
E. Migrate a virtual machine with Storage vMotion.
【多选题】
Which three are supported upgrade processes for ESXi host? (Choose three.)___
A. using vSphere Auto Deploy
B. using a TFTP server
C. using Update Manager
D. using an
E. SXCLI command
【多选题】
When enabling Storage DRS on a datastore cluster, which three components are enabled as a result? (Choose three.)___
A. Space load balancing among datastore within the datastore cluster.
B. Initial placement for virtual disks based on space and I/O workload.
C. I/O load balancing among datastores within the datastore cluster.
D. Queue Depth alerting on disks within the datastore cluster.
E. Data de-duplication within the datastore cluster.
【多选题】
What are two features introduced in Network I/O Control version 3? (Choose two.)___
A. Bandwidth reservation per traffic type
B. Network resource pools
C. CoS tagging
D. Bandwidth guarantee to virtual machines
推荐试题
【单选题】
AMD12、 一个项目团队成功实现了一个关键里程碑。为此,团队满足了一个新工艺的关键技术需求,然后使用该工艺开发了几个类似可交付成果的第一个。项目经理下一步应该怎么做?___
A. 开展绩效评估
B. 将该项目移交给运营团队
C. 记录经验教训
D. 确保已记录最终成本
【单选题】
AMD13、 项目经理想要采购一些订制产品,且可以从多个供应商处获得相同等级和质量的订制产品。若要确保他们的报价具有可比性,采购包中应包含哪些内容?___
A. 定制产品的成本估算
B. 详细说明所需产品必须属性和测量指标的工作说明书(SOW)
C. 经批准的项目范围说明书,工作分解结构(WBS)和 WBS 词典
D. 风险管理计划以及风险管理审查报告
【单选题】
AMD14、 在识别一个新项目的风险时,项目团队考虑到以下内容:1.一次罕见的自然灾害可能会撞击建筑物并导致建筑物倒塌 2.存储所有项目技术数据的现有数据库已过时,并可能会失效。 项目经理应该怎么做?___
A. 请求将项目转移给另一个区域的团队
B. 建议取消该项目
C. 将该风险添加进风险登记册
D. 通知发起人这两种风险的概率和影响都非常低
【单选题】
AMD15、 项目发起人指出,为确保项目成功,必须让客户意识到可能存在的延误和问题。为此,客户希望他们的技术团队直接与项目的技术团队进行沟通。若要确保这项请求得以解决,项目经理应该审查哪一份文件?___
A. 沟通管理计划
B. 需求跟踪矩阵
C. 执行、负责、咨询和知情(RACI)矩阵
D. 项目章程
【单选题】
AMD16、 由于升职,一位新相关方加入到一个项目中。该相关方对其新角色的操作责任有良好的认识,但未接受过与该项目角色相关的培训。项目经理应该怎么做?___
A. 与新相关方开会,审查相关项目文件并收集背景信息,然后更新相关方登记册
B. 请新相关方书面确认他们对新角色的理解,然后更新项目章程
C. 更新项目治理计划以添加这位新相关方,并包含相关责任的描述以反映这项变更
D. 修订工作分解结构(WBS),以包含这位新相关方的相关可交付成果
【单选题】
AMD17、 项目经理正在制定相关方参与计划,并识别到一位权力等级较高但在项目中兴趣较低的相关方,项目经理应该如何对待该相关方?___
A. 重点管理
B. 随时告知
C. 监督
D. 令其满意
【单选题】
AMD18、 项目经理识别到项目相关方具有明显不同的需求和期望。为确保项目成功,项目经理应该怎么做?___
A. 应用推进技术
B. 创建权力/影响方格
C. 执行风险分析
D. 定义角色和职责
【单选题】
AMD19、 在项目执行期间,某些任务所花的时间比预期长,团队成员之间存在一些分歧,并且发起人要求迅速采取行动来解决这个问题。项目经理应该怎么做?___
A. 制定团队章程
B. 与团队一起审查团队章程
C. 与人力资源部门和团队一起开会讨论这个问题
D. 执行冲突管理过程
【单选题】
AMD20、 一位团队成员急于将客户正在考虑的新功能添加到项目可交付成果中。在开始为这些新功能工作之前,需要谁的批准?___
A. 项目经理
B. 变更控制委员会(CCB)
C. 项目发起人
D. 主题专家(SME)
【单选题】
AMD21、 在一个价值 100 万美元的项目中途,项目经理进行挣值分析(EVA),分析显示计划价值(PV)为 623,000 美元,挣值(EV)为 523,000 美元,实际成本(AC)为 643,000 美元。根据这些数字,项目的成本偏差(CV)和进度偏差(SV)分别是多少?___
A. CV = +120.000 美元,SV = +100,000 美元
B. CV = +100.000 美元,SV = +120,000 美元
C. CV =-100.000 美元,SV =-120,000 美元
D. CV =-120.000 美元,SV =-100,000 美元
【单选题】
AMD22、 项目发起人通知项目经理,最关键的项目标准是按时交付产品,客户对资源可用性没有时间限制,哪个行动会减少时间表,但会增加风险?___
A. 添加团队成员
B. 并行执行活动
C. 外包项目执行
D. 聘请高薪专家
【单选题】
AMD23、 项目经理成功完成一个项目,需要收集在地理位置上分散的大量相关方的反馈意见。项目经理应该用什么沟通方法来收集反馈意见?___
A. 拉式沟通
B. 推式沟通
C. 有效沟通
D. 互动式沟通
【单选题】
AMD24、 在新项目的相关方会议中,项目经理发现一名相关方对项目有抵触。项目经理记录这个问题,并对该相关方的参与程度评级。项目经理使用了哪项工具或技术来为相关方的参与程度评级?___
A. 相关方参与评估矩阵
B. 风险概率和影响评估
C. 人际关系技巧
D. 专家判断
【单选题】
AMD25、 由于质量过程的问题,一个项目明显落后于进度计划。项目相关方坚持要求项目经理采取任何必要的行动来满足初始时间表。项目经理下一步应该怎么做?___
A. 与相关方谈判质量标准并更新质量管理计划
B. 重新确定客户的需求清单优先级并调整项目范围
C. 在风险登记册中记录所有问题并接受质量过程
D. 审查质量核对单以确定根本原因并实施所需的变更
【单选题】
AMD26、 在项目状态审查会议期间,显而易见的是,整体项目效绩低于预期的项目目标,并且一些关键的可交付成果未能满足客户的需求。项目经理应该怎么做?___
A. 更新范围管理计划并执行备选方案分析
B. 使用德尔菲技术并执行备选方案分析
C. 执行趋势分析并更新质量管理计划
D. 执行根本原因和备选方案分析
【单选题】
AMD27、 一家公司开始进行敏捷实践,以便更好的接触全球客户和市场,在过渡期间,很多团队都在与这个变化做斗争,因此影响士气,敏捷教练应该怎样做才能最好的利用敏捷实践并实现高绩效?___
A. 与团队成员单独开会,为他们提供项目及其对组织带来好处的一个大蓝图
B. 与团队及其经理紧密合作,通过辅导,指导,教学和推进来识别和解决问题
C. 仅在团队层面教导,提供有关期望的信息,并帮助个人提升技能
D. 获得相关方对团队有效性的反馈,并与团队分享
【单选题】
AMD28、 一个项目已经启动,该项目拟标准化四个国家的人力资源模块开发。每个国家都有不同的人力资源管理流程。其中两个国家与相关方,没有提供任何意见,迫使项目经理在没有他们的意见下制定项目计划,并将其发送给四个国家的所有相关方进行批准。到目前为止已经收到三份批准。项目经理下一步应该怎么做?___
A. 开始项目执行,因为项目计划不需要所有相关方的意见
B. 开始项目,因为大多数相关方己经批准了这项计划
C. 等到所有项目相关方都参与并批准项目计划,然后开展项目执行
D. 等待所有相关方的意见,然后由于大多数相关方已经批准,先开始项目执行
【单选题】
AMD29、 两家公司之间的并购项目正处于启动阶段,显然这个项目对这两个组织产生影响。若要确保项目成功,发起人应关注下列哪一项?___
A. 明确定义项目目标,优先事项和战略
B. 预算
C. 沟通管理计划
D. 变更管理计划
【单选题】
AMD30、 项目经理正在管理价值 300 万美元、涉及两个供应商的项目。项目经理为每名供应商创建了一份工作说明书(SOW)。下列哪一项需要 SOW 的信息? ___
A. 风险管理计划
B. 合同
C. 采购管理计划
D. 供应商范围说明书
【单选题】
AMD31、 在一个项目中,一位关键项目团队成员因私事请假两个月,项目经理首先应该怎么做?___
A. 询问这位关键团队成员是否可以推迟请假
B. 与职能经理协商替换一名团队成员
C. 评估对项目的影响
D. 审查资源管理计划
【单选题】
AMD32、 一家跨国公司的组织单位有大量的产品增强功能待办事项,这些产品增强功能是暂时保留的用户故事。待批准的预算申请在上周获得批准。作为初始程序的一部分,新任命的项目经理应该做些什么?___
A. 记录项目生命周期和方法讨论需求
B. 为所有用户故事制定一份进度计划
C. 对所有用户故事执行风险评估
D. 根据以前相同产品的项目分配资源
【单选题】
AMD33、 在项目结束时要求进行一项重要变更,虽然需要进行这项变更来解决可能影响业务连续性的紧急问题,但会延长进度计划并增加成本。项目经理下一步应该怎么做?___
A. 拒绝该变更
B. 提交变更请求
C. 实施该变更
D. 沟通对预算和进度的影响
【单选题】
AMD34、 项目经理识别到本地和虚拟团队成员之间的进度优先级存在冲突,项目经理安排了一次电话会议来管理这个冲突。项目经理使用的是哪种冲突解决技巧?___
A. 缓和/包容
B. 合作/解决问题
C. 强迫/命令
D. 妥协/调解
【单选题】
AMD35、 项目发起人对项目进行审查并对一些项目风险提出质疑,项目发起人要求项目经理分析这些风险对项目总体目标的影响。项目经理应该执行下列哪一项?___
A. 定量和定性风险分析
B. 假设条件和制约因素分析
C. 优势、劣势、机会与威胁(SWOT)分析
D. 核对单分析
【单选题】
AMD36、 管理层将一个国际项目分配给一位新项目经理。这是该项目经理第一次与团队合作,团队成员位于两个国家,数量平均分布,一个团队由最合适个人工作的成员组成,另一个团队由最适合团队工作的成员组成。项目经理该怎么做?___
A. 更新风险登记册
B. 要求团队在项目期间以相似的风格工作
C. 修订沟通管理计划
D. 为团队设置一个虚拟协作工具,以便每天签到
【单选题】
AMD37、 一个项目团队成员已经延迟两次交付一个工作包,其职能经理已经通知项目经理,该团成员资历较新,需要时间学习。项目经理应该怎么做?___
A. 要求职能经理替换该团队成员
B. 与该团队成员私下讨论该问题
C. 向该团队成员提供培训
D. 在团队会议上讨论该问题
【单选题】
AMD38、 某位项目相关方要求对已批准的产品设计进行变更,程序员仅需少量工作就可进行这项变更。但是存在一个风险,即另一位相关方将不同意这项变更。项目经理应该怎么做?___
A. 由于不存在重大的财务影响,因此实施这项变更
B. 根据变更管理计划创建一份变更要求
C. 请求项目发起人的批准
D. 与相关方谈判接受这项变更
【单选题】
AMD39、 一名高管在生产上线期间加入敏捷团队,在上线之后,该高管希望知道 sprint 冲刺期间哪些进展顺利,以及哪些进展不顺利,该高管应该参加什么会议? ___
A. 回顾会议
B. 每日 scrum 会议
C. sprint 评审会议
D. sprint 计划会议
【单选题】
AMD40、 在交付某个产品功能的迭代过程中,相关方要求提供不包含在计划工作范围内的一项新功能,该相关方威胁说,如果该新功能未包含在当前迭代中,将会把问题升级上报给高级管理层,若要解决这个问题,敏捷管理专业人士应该怎么做?___
A. 与该项目相关方开会,讨论现在仅实施部分新功能
B. 与团队和产品负责人合作,重新确定此新功能的优先级
C. 要求该项目相关方获得高级管理层的批准
D. 向高级管理层请求指导
【单选题】
AMD41、 项目可行性研究确定了应该创建什么产品。现在,开发与原始需求冲突的另一种产品的一项变更请求,已经获得批准,在变更请求获得批准前已进行数据分析。项目经理应该怎么做?___
A. 实施该变更请求
B. 拒绝该变更请求
C. 请求详细的数据分析报告
D. 请求新产品的可行性研究
【单选题】
AMD42、 一位团队成员通知项目经理,供应商延迟交付一个重要部件,由于潜在的影响,该团队成员希望项目经理允许直接通知发起人并生成与这种情况相关的警报。项目经理应该查阅哪一份计划?___
A. 采购管理计划
B. 沟通管理计划
C. 相关方参与计划
D. 风险管理计划
【单选题】
AMD43、 一名新项目经理收到一份项目章程草案,哪些信息将帮助项目经理参与完成这份文件?___
A. 商业论证
B. 项目进度计划
C. 成本基准
D. 项目管理系统(PMIS)
【单选题】
AMD44、 项目经理与一个由 15 人组成的团队召开会议,会议不断发生中断,会议目标几乎没有完成。若要解决这个问题,项目经理应该怎么做?___
A. 冲突管理
B. 政治意识
C. 非语言沟通
D. 积极倾听
【单选题】
AMD45、 一位新项目经理加入了由高级项目经理监督的项目,发起人要求新项目经理制定质量管理计划,项目经理应该怎么做?___
A. 向高级项目经理咨询已制定的质量过程和计划,并在选择适当的标准时寻求指导
B. 与客户开会收集需求
C. 要求发起人提供成本效益分析和标杆对照样本
D. 提交变更请求,以推迟质量管理计划的制定,直到质量矩阵和质量检查表被创造
【单选题】
AMD46、 按照最初的计划继续工作,同时认识到该项目的规模已经大到由指导委员会取代单一的项目发起人。项目经理应该怎么做来适应这种新发展?___
A. 认识到相关方结构发生了变化,并量身定做与这个团队的沟通
B. 继续按照初始计划工作,同时认识到项目现在包括其他相关方
C. 为团队组织一次与新的指导委员会一起召开的会议,继续进行项目工作
D. 与新的委员会分享当前的状态报告
【单选题】
AMD47、 一个项目经理完成一个主要的 IT 开发项目,项目经理与发布经理确认,所有系统都在工作,并且功能已经完成通过质量保证认证学习。通知客户后,项目经理下一步应该做什么?___
A. 以学习到的经验为基础更新组织知识库
B. 更新风险登记册、项目相关方和项目团队成员
C. 完成采购计划
D. 验证并完成发布文档
【单选题】
AMD48、 在一次迭代结束时,一位团队成员告诉项目经理,由于几天前出现无法解决的问题,一个计划任务未完成。若要在将来避免这种情况,项目经理应该怎么做?___
A. 在回顾总结会议上讨论该问题
B. 在演示中说明该问题
C. 在下一次迭代规划会上讨论该问题
D. 在下一次每日站会上审查该问题
【单选题】
AMD49、 在一个价值 50,000 美元的项目中途,项目经理进行挣值分析(EVA)。结果显示计划价值(PV)为25,000 美元,挣值(EV)为 20,000 美元,实际成本(AC)为 15,000 美元。根据这些结果,项目的状态是什么?___
A. 落后于进度,并超出预算
B. 落后于进度,但低于预算
C. 超前于进度,并低于预算
D. 超前于进度,但超出预算
【单选题】
AMD50、 项目经理接到来自供应商的电话,说由于工厂发生洪水,可交付成果将发生严重延期,项目经理下一步应该怎么做?___
A. 检查协议或采购订单
B. 更新项目进度计划
C. 提交一份合同变更请求
D. 确认工作说明书(SOW)
【单选题】
AMD51、 在项目执行过程中,一位关键相关方对该项目经理实施一项风险规避策略的大量成本表示担心,项目经理应该告诉相关方什么信息?___
A. 如果这个风险变为现实,则项目成本可能高于高风险规避策略的成本
B. 这个风险变成现实的概率很高,因此风险规避成本是必要的
C. 这个风险在风险登记册中的优先级和影响均较高
D. 他们将终止风险规避策略以减少项目费用