【多选题】
Boot from SAN is supported on which three storage technologies? (Choose three.)___
A. VMware vSAN
B. FCoE
C. NFS 4.1
D. iSCSI
E. FC
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which two components are part of storage I/O multipathing on ESXi? (Choose two.)___
A. SATP
B. VASA
C. PSP
D. VAAI
【多选题】
Which two statements are true about Highly Available vSphere Auto Deploy infrastructure? (Choose two.)___
A. It helps prevent data loss.
B. It is a prerequisite for using vSphere Auto Deploy with stateful install.
C. It requires two or more Auto
D. eploy servers.
【多选题】
The virtual machine log rotation size can be changed for all VMs by which two interfaces? (Choose two.)___
A. PowerCLI
B. vSphere Web Client
C. ESXi host client
D. esxcli
【多选题】
Which two configuration options can exclude virtual disks from snapshot operations? (Choose two.)___
A. Use RDM in virtual mode for virtual disk.
B. Use virtual disks in Independent – Persistent mode.
C. Use a virtual disk larger than 2 TB in size.
D. Use RDM in physical mode for virtual disk.
【多选题】
Which two storage configurations on the source server are unsupported with VMware Converter? (Choose two.)___
A. Linux LVM
B. software RAID
C. GPT/MBR hybrid disks
D. Windows basic volumes
E. Windows dynamic volumes
【多选题】
Which two statements about vCenter HA are correct? (Choose two.)___
A. ESXi 5.5 or later is required.
B. vCenter HA network latency between nodes must be less than 50 ms.
C. NFS datastore is supported.
D. It must be deployed on a 3
E. SXi host cluster with DRS enabled.
【多选题】
An attempt to delete NFS datastore from a ESXi host returns the error: Sysinfo error on operation returned the following status:< Busy> Which two statements could explain this failure? (Choose two.)___
A. NFS datastore is a part of Storage DRS Cluster.
B. NFS.VolumeRemountFrequency value is set to 30.
C. Storage I/O Control is enabled on NFS datastore.
D. NFS datastore has running or registered virtual machines.
【多选题】
An administrator finds that the Microsoft Exchange virtual machines are exhibiting network latency. What two in-guest changes can help decrease latency? (Choose two.)___
A. LRO
B. TSO
C. SR-IOV
D. PVRDMA
【多选题】
Which two types of iSCSI adapters require VMkernel networking configuration? (Choose two.)___
A. dependent hardware
B. in-guest
C. software
D. independent hardware
【多选题】
Which two statements are true for NFS v4.1 firewall behavior? (Choose two.)___
A. It closes port 2049.
B. It sets allowed. All flag to TRUE.
C. It sets allowed. All flag to FALSE.
D. It opens port 2049.
【多选题】
A vSphere Administrator attempts to enable Fault Tolerance for a virtual machine but receives the following error: Secondary VM could not be powered on as there are no compatible hosts that can accommodate it. What two options could cause this error? (Choose two.)___
A. The other ESXi host(s) are in Maintenance Mode.
B. Hardware virtualization is not enabled on the other ESXi host(s).
C. The other ESXi host(s) are in Quarantine Mode.
D. Hardware MMU is enabled on the other
E. SXi host(s).
【多选题】
Storage capabilities be populated in what two ways? (Choose two.)___
A. The administrator can use tags to describe capabilities.
B. Default capabilities are provided by vCenter Server.
C. Datastores can advertise their capabilities through VAAI.
D. Datastores can advertise their capabilities through VASA.
【多选题】
In network troubleshooting it is important to know what upstream switch the ESXi host is connected to. Which two features does ESXi provide to help identify the upstream switch? (Choose two.)___
A. Promiscuous mode
B. DPM
C. LLDP
D. CDP
【多选题】
Virtual Volumes supports which three VMware features? (Choose three.)___
A. Instant Clones
B. Distributed Resource Scheduler
C. Linked Clones
D. vMotion
E. Storage Distributed Resource Scheduler
【多选题】
vSphere DRS helps to balance virtual machines with available resources in a vSphere cluster. What three types of resources can be taken into account for balancing? (Choose three.)___
A. CPU
B. physical NIC saturation of an ESXi host
C. virtual NIC saturation of a virtual machine
D. RAM
E. storage latency
【多选题】
Which three design requirements must be satisfied to enable RAID-6 objects in a VMware vSAN cluster? (Choose three.)___
A. vSAN Advanced license or higher
B. vSAN stretched cluster
C. at least six hosts contributing storage
D. deduplication and compression
E. all flash configuration
【多选题】
When using "Cluster resource percentage" for host failover capacity in vSphere HA Admission Control, the total resource requirements are calculated from which two values? (Choose two.)___
A. Total vCPUs assigned to each VM.
B. Average CPU usage on each VM over time.
C. Memory reservations on each VM.
D. Total memory assigned to each VM.
E. Average active memory on each VM over time.
F. CPU reservations on each VM.
【多选题】
Which are four attributes of the Active vCenter HA node? (Choose four)___
A. It uses the vCenter HA network to communicate with the Witness node.
B. It constantly replicates vPostgres data with the Witness node.
C. It uses a public IP address for the management interface.
D. It runs the active vCenter Server Appliance instance.
E. It uses the vCenter HA network for replication of data to the Passive node.
F. It provides a quorum to protect against split-brain situations.
【多选题】
Which are two vCenter Server two-factor authentication methods? (Choose two.)___
A. RSA SecurID
B. Smart Card
C. SAML
D. Symantec VIP
【多选题】
An administrator is creating VMkernel adapters on an ESXi 6.5 host and wants to create separate VMkernel adapters for every type of traffic in the default TCP/IP stack. Which three types of traffic can be explicitly enabled on a separate VMkernel adapter? (Choose three.)___
A. Virtual SAN traffic
B. NFS traffic
C. vMotion traffic
D. vSphere HA traffic
E. Fault Tolerance logging traffic
【多选题】
When migrating a Windows vCenter Server 6.0 to the vCenter Server Appliance 6.5, which two will be migrated by default? (Choose two.)___
A. Local Windows OS users and groups
B. Configuration
C. Custom ports
D. FQDN
E. Historical and Performance data
【多选题】
Which three types of Content Libraries exist within vSphere 6.5? (Choose three.)___
A. Remote Content Library
B. Published Content Library
C. Local Content Library
D. Shared Content Library
E. Subscribed Content Library
【多选题】
An administrator cannot enable multi-processor Fault Tolerance (SMP-FT) for a virtual machine. Which are two possible causes for this? (Choose two.)___
A. The virtual machine is running on a vSAN datastore.
B. The Fault Tolerance network is using a 10Gbit uplink.
C. The virtual machine has 6 vCPUs assigned.
D. The virtual machine has a 1TB VMDK attached.
E. The virtual machine has snapshots present.
【多选题】
Which two statements are true for Predictive DRS? (Choose two.)___
A. It balances resource utilization for virtual machines with unpredictable utilization patterns.
B. It integrates DRS with vRealize Operations Manager to balance workloads for virtual machines before resource utilization spikes occur.
C. It balances resource utilization based on a threshold's algorithm that runs each night.
D. It determines the best placement and balance of virtual machines based on a threshold's algorithm that runs each night in vCenter Server 6.5 Database.
【多选题】
Which two situations could cause a virtual machine to appear with (orphaned) appended to its name? (Choose two.)___
A. if a host failover is unsuccessful
B. if a virtual machine was removed from vCenter Server's inventory
C. if a virtual machine was deployed from template, and the template has been deleted
D. if a virtual machine is unregistered directly on the host
【多选题】
Which three requirements are needed to apply RAID 5 or RAID 6 erasure coding on a vSAN 6.2 or 6.5 object? (Choose three.)___
A. on Disk Format 3.0
B. Hybrid vSAN
C. All Flash vSAN
D. vSAN Advanced License
E. Stretched Cluster Configurations
【多选题】
An administrator sees the following error in the log files: Which two events could be the source of the error message? (Choose two.)___
A. vCenter Server failure
B. VXLAN failure
C. Disk array failure
D. Network failure
E. ESXi host failure
【多选题】
An administrator is attempting to access an ESXi host via the DCUI but is unable to do so. Which could be two possible causes? (Choose two.)___
A. The host in Qhas no out-of-band management capability (i.e. iLO/iDRAC).
B. The SSH service is disabled on the host.
C. Strict lockdown mode is enabled on the host.
D. Normal lockdown mode is enabled and the administrator is a member of the
E. xception User list.
【多选题】
Which two permissions are required to migrate a virtual machine with Storage vMotion? (Choose two.)___
A. Network > Move Network
B. Virtual Machine > Inventory > Move
C. Resource > Migrate powered on virtual machine
D. Datastore > Allocate Space
【多选题】
Which are three supported storage requirements for vCenter Server HA? (Choose three.)___
A. NFS
B. RDM
C. vSAN
D. VMFS
E. JBOD
【多选题】
Which are the two network requirements for a VMware vSAN 6.5 cluster? (Choose two.)___
A. Multicast must be enabled on the physical switches and routers that handle vSAN traffic.
B. vSAN requires IPv6 only.
C. All hosts must have a dedicated 40GbE NIC.
D. The vSAN network supported IPv4 or IPv6.
E. vSAN requires IPv4 only.
【多选题】
Which three prerequisites must be in place prior to enabling secure boot for a virtual machine? (Choose three.)___
A. VirtualMachine.Config.Settings privileges
B. an encrypted USB drive
C. Virtual Hardware version 13 or later
D. Virtual Hardware version 12 or later
E. EFI firmware
【多选题】
A user is given the "Virtual machine user (sample)" role in a vSphere 6.x environment. Which three permissions would the user be able to perform? (Choose three.)___
A. Reset a virtual machine.
B. Power on a virtual machine.
C. Move a host into a cluster.
D. Configure CD media.
E. Migrate a virtual machine with Storage vMotion.
【多选题】
Which three are supported upgrade processes for ESXi host? (Choose three.)___
A. using vSphere Auto Deploy
B. using a TFTP server
C. using Update Manager
D. using an
E. SXCLI command
【多选题】
When enabling Storage DRS on a datastore cluster, which three components are enabled as a result? (Choose three.)___
A. Space load balancing among datastore within the datastore cluster.
B. Initial placement for virtual disks based on space and I/O workload.
C. I/O load balancing among datastores within the datastore cluster.
D. Queue Depth alerting on disks within the datastore cluster.
E. Data de-duplication within the datastore cluster.
【多选题】
What are two features introduced in Network I/O Control version 3? (Choose two.)___
A. Bandwidth reservation per traffic type
B. Network resource pools
C. CoS tagging
D. Bandwidth guarantee to virtual machines
【多选题】
Which two correct virtual machine advanced configuration parameters will accomplish this? (Choose two.)___
A. isolation.device.edit.disable = “FALSE”
B. isolation.device.edit.disable = “TRUE”
C. isolation.device.connectable.disable = “FALSE”
D. isolation.device.connectable.disable = “TRUE”
【多选题】
Which three statements are correct regarding booting an ESXi Host from Fibre Channel SAN? (Choose three.)___
A. Direct connect topology is supported.
B. Each host must have its own boot LUN.
C. ESXi hosts do not require local storage.
D. Multipathing to a boot LUN on an active-passive array is supported.
E. Hosts can share one common boot LUN.
【多选题】
Which two tasks should a vSphere administrator perform if the vmkernel log reports VMFS metadata errors? (Choose two.)___
A. contact VMware technical support
B. reformat the datastore
C. check the device with VOMA
D. ignore the messages
【多选题】
Which two statements are true for a vCenterServer user account that is used for vSphere Data Protection (VDP)? (Choose two.)___
A. The user account must be assigned with Administrator role.
B. The password for the user account cannot contain spaces.
C. The user account should be created in the Single Sign-On domain
D. The user account cannot inherit required permissions from a group role.
推荐试题
【单选题】
团队成员 A 希望离开团队,不断抱怨团队成员 B 的个性,项目经理应该怎么做?
A. 与二名团队成员分别谈话,了解他们当前关系的真实情况
B. 告知团队成员 A 会把团队成员 B 从项目中开除
C. 解决团队会议上的冲突,并促进解决方案
D. 让团队成员尝试合作到项目结束为止
【单选题】
在一个矩阵型组织中工作的项目经理发现一名成员经常在会议中迟到,并且对同事非常粗暴无理。这种行为对项目团队施加了压力。项目经理下一步该怎么做?
A. 将该名团队成员从项目中开除
B. 与该名团队成员的职能经理一起解决这个问题
C. 组织一次与该名团队成员的会议,了解这种行为背后的原因
D. 为项目团队增加合同资源,已完成该名团队成员的工作任务
【单选题】
在项目环境下,下列有关沟通的论述哪一个是正确的?
A. 项目经理必须承担主要责任,以确保发现的消息已经收到。
B. 有效的会议,作战室和紧密型矩阵可以促进有效的沟通。
C. 如果一个项目由 12 个人组成,则存在 48 个潜在的沟通渠道。
D. 大多数项目经理花费 30%的工作时间用于沟通。
【单选题】
前任项目经理编制了项目预算。在项目进入执行阶段不久,他就离职了。你是刚就任的项目经理。通过审查,你发现这个项目预算明显不可行。你应该怎么办?()
A. 不采取任何行动,反正没有人指望你能在预算内完工
B. 重新编制项目预算,并按新预算执行
C. 向公司报告前任项目经理的无能
D. 向公司提交情况分析报告
【单选题】
一位初级项目团队成员对一位高级团队成员提交的建议书中的方法提出质疑。这两名团队成员的争论现在威胁到项目进度。仔细考虑之后,项目经理同意初级团队成员的意见,修改建议书。项目经理使用的是什么方法?
【单选题】
两位项目团队成员在项目会议上就项目问题发生言辞冲突,发生这种情况时项目经理无法控制。如果项目经理在哪个过程组制定一些基本规则就可以避免?
【单选题】
在合同下的沟通应该趋向_____解决问题
A. 正式书面沟通。
B. 正式口头沟通。
C. 非正式书面沟通。
D. 非正式口头沟通。
【单选题】
在质量检查过程中,项目经理发现由于对已批准的变更请求的执行不力,一个可交付成果仍然不符合质量要求。项目经理接下来应该怎么做?( )
A. 更新项目进度计划
B. 确定一个纠正措施
C. 利用应急储备
D. 执行缺陷补救
【单选题】
在一个关键项目阶段中,由于团队成员之间的内部冲突导致团队绩效下降。冲突的原因不明,但是问题必须解决。项目经理接下来应该怎么做?
A. 与每名团队成员分别谈话,了解冲突的原因并解决问题。
B. 项目经理行使职权,并在不产生能够影响项目履行的其他问题情况下强迫团队继续工作
C. 与每名团队成员分别谈话,了解冲突的原因,并允许他们自己解决冲突。
D. 将该问题上报给指导委员会。
【单选题】
下述技术可以用来保持会议焦点集中,除了:
A. 回顾议程条款/会议的目的
B. 阶段性地总结讨论过的内容
C. 鼓励追求有趣味的新想法
D. 重新描述小组成员提出的措辞不明的想法
【单选题】
一些项目的可交付成果的变更已经记录在项目管理计划中。这些变更,以及其他项目的信息,已经根据沟通管理计划而发布出去了。当一名相关方听到了这个变更时,向项目经理表达了自己的惊讶。所有的利益相关者都收到了包含变 更的通知。项目经理应该怎么做?
A. 了解为什么那位相关方没有收到信息,并且让他知道什么时候公布的信息。
B. 询问职能经理为什么那名相关方不能理解他的责任。
C. 回顾沟通管理计划,并进行必要的修改。
D. 在下次指导委员会会议上解决这个问题,这样其他人就不会错过公布的 变更。
【单选题】
客户要求增加一个新功能,经过一周的流程审查,该请求已经被变更控制委员会批准。接下来项目团队应该()
A. 执行增加的新功能
B. 开展质量功能展开
C. 更新变更日志
D. 分析增加新功能对预算的影响
【单选题】
在得知团队中发生冲突之后,项目经理尝试通过强调团队达成共识的方面.而不强调未达成共识的方面来解决冲突。这属于以下哪一种冲突管理的范例?
A. 妥协/调解
B. 缓解/包容
C. 合作/解决问题
D. 撤退/回避
【单选题】
在当今的高科技环境中,要成功的激励一个团队,项目经理要使用哪些激励理论才能保持一个快乐高效的团队?
A. 期待.理论 X
B. 理论 Y 和 Maslow 等级制度
C. 理论 Y,期待.Herzberg 保健因素
D. Herzberg 保健因素.期待
【单选题】
一位项目经理无意中听到了两位相关方的谈话,他们在讨论项目对他们各自部 门产生的影响令他们十分不高兴。相关方 A 问道,项目是否按时进行,相关方 B 回答 SPI 是 1. 05。相关方 A 问负责该项目的项目经理是否知道相关方 B 的 担忧。相关方 B 回答他不确定。项目经理最应该做的事情是什么?
A. 确保相关方看见项目经理无意中听到了。然后要求他们把问题直接以书面的形式呈现给项目经理。
B. 向所有的相关方做一个关于项目状态的展示。
C. 向两名相关方发送一份问题日志的副本并且询问一些附加意见。
D. 为两名相关方安排一个会议,允许他们发表他们的任何担忧。
【单选题】
你刚被聘请为项目经理,为一家已经通过 ISO9000 系列质量管理体系认证的公司管理一个生产流程再造项目。你即将开始规划质量管理过程。你知道首先必须确定项目的质量政策。你应该( )
A. 把该公司的质量政策照搬到项目上来
B. 根据你过去所服务的公司的质量政策,编制本项目的质量政策
C. 寻求 PMI 的帮助,以便制定一流的项目质量政策
D. 召集项目管理团队,集体讨论,并编写项目的质量政策
【单选题】
项目经理正在创建沟通计划,意识到除了总共六个项目团队成员之外,计划中还应包 11 名相关方,这个项目沟通渠道有多少个?
A. 21
B. 55
C. 136
D. 153
【单选题】
何时以及需要收集哪些信息是以下哪项内容的一部分?
A. 正式报告。
B. 规划沟通。
C. 相关方管理。
D. 挣值。
【单选题】
Frank 正在负责某个新合并的项目。决定要分发什么信息给团队和项目相关方,对于这一个部分工作,Frank应该考虑_。
A. 项目相关方不需要所有信息
B. 仅提供项目成本和进度信息
C. 所需要信息的详尽程度
D. 仅提供项目发起人要求的信息
【单选题】
针对一个新系统开发项目,项目经理已经记录了将使用该系统的 10 个业务部们的具体需求。项目经理发现他们的需求数量众多,而且存在不少不一致甚至矛盾之处。项目经理接下来最应该做什么?( )
A. 要求这些业务部门自行解决问题
B. 自己编写一份报告来协调各部门的要求
C. 召开一次焦点小组会议
D. 使用引导技术
【单选题】
一个项目中有 20 个相关方,项目结束时,又确定了另外 5 个相关方。在项目结束时存在多少个沟通渠道?
A. 190
B. 195
C. 300
D. 305
【单选题】
作为项目计划的一部分,你需要为你的项目中的多个国家的相关方制定有效的沟通方法。你有多种沟通媒介可供选择。要制定这样的沟通计划,你应该:
A. 利用从前项目中可行的标准媒介。
B. 利用多种媒介形式,确保每一个人都收到信息。
C. 与相关方讨论各种选择,获得他们的输入。
D. 找项目发起人获得额外的资金以便制定针对项目的基础设施。
【单选题】
项目上的一个控制账户的工作已经全部完成。最终的工作绩效信息显示:成本偏差是-1 万元,进度偏差为 0 元。为此,我们可以得出如下哪个结论?()
A. 成本超支,但无法判断进度提前或落后
B. 成本超支,但进度完全符合计划
C. 成本超支,进度提前
D. 成本超支,进度落后
【单选题】
项目经理邀请相关方参加项目状态评审。沟通管理计划中包含 12 名成员成员。同时额外请求增加 2 名相关方。那么还需要多少个额外沟通渠道?
A. 6 个
B. 54 个
C. 66 个
D. 120 个
【单选题】
一个设计项目经历了两个月后,客户要求修改产品,项目经理对此事并不知情。在最终测试阶段,测试结果和计划规定的不符。这是以下哪个选项的例子?
A. 范围控制的较差。
B. 未遵循沟通管理计划。
C. 质量管理计划规划的不到位。
D. 对测试计划的定义规定不足。
【单选题】
项目经理针对项目可能会遇到的二个情景完成了蒙特卡洛分析. 其中一个情景的结果是有 60%的可能性会花费 100 万美元. 另一个情景的结果是有 40%的可能性会花费 200 万美元.这是用了什么方法?
A. 德尔菲法
B. 预期货币价值分析决策树分析
C. 定量风险分析
D. 定性风险分析
【单选题】
项目关键时期两个项目成员突然离开了项目,项目经理首先应当怎么做? ( )
A. 提出变更请求
B. 分析影响,制订风险应对计划
C. 招聘新员工
D. 修订资源管理计划
【单选题】
社区利益群体在一个项目中具有关键利益。他们要求正式发布变更请求之前,有关项目成本和进度的所有调整都需要经过他们的评审。项目经理应该将社区利益群体的要求记录在下列哪种文件当中?
A. 需求文件
B. 项目章程
C. 正式验收文件
D. 变更登记表
【单选题】
项目团队在远距离沟通上遇到了困难,13 位团队成员来自不同的 2 个国家,后来又增加了 5 位来自印度的成员。这应该引起项目经理的关注,因为:
A. 沟通渠道迅速增加。
B. 使用奖励权力变得更困难。
C. 沟通阻碍者以直线的速度增加。
D. 项目优先级的增加导致冲突的增加。
【单选题】
项目经理会用哪种数据分析方法来计算平均支出当他预测不到未来前景的结果时?
A. 敏感性分析
B. 预期货币值分析
C. 蒙特卡洛分析
D. 专家判断
【单选题】
在一个应用传统技术实施的 IT 项目中,客户提出了云端分布式部署的变更请求,并支付了一笔为数不菲的概念验证费用。各种测试证明,该传统技术可以支持云端分布式部署,但会造成性能下降和系统安全性下降。作为项目经理,接下来你应该怎样做?()
A. 告知客户照合同执行,因为合同是严肃的,不能修改
B. 基于测试结果,与客户商谈合同变更
C. 告知客户可以执行云端分布式部署
D. 拒绝客户的云端分布式部署要求
【单选题】
在一个复杂的项目中,相关方有着不同的信息需求. 下列哪种方法可帮助项目经理满足相关方的期望?
A. 沟通模型
B. 沟通管理计划
C. 沟通矩阵
D. 沟通范围
【单选题】
缺少沟通和争议未解决意味着:
A. 项目错综复杂
B. 进度计划失灵
C. 项目小组效率不高
D. 项目小组职责不明确。
【单选题】
可以转移的可保险风险属于下列哪一项?
A. 法律责任
B. 客户响应
C. 资源可用性
D. 衰退
【单选题】
一个自动化设计团队应该熟悉最新的自动装配技术。团队可通过一系列的途径得到这种知识:聘请相应的专家,聘请咨询顾问,将某个工程师送去参加相关培训,或者邀请制造部门的人加入团队。每一种方法的相关成本都必须在项目计划中给予考虑。这显示了以下哪一点的重要性?( )
A. 在完成活动定义前完成活动资源估算
B. 把合适的资源分配到合适的岗位上
C. 通过估算成本来调整项目资源计划
D. 资源计划是挣值管理的基础
【单选题】
有一大型的电信项目进行到了一半,这时你取代了之前的项目经理。该项目涉及 3 个不同的卖方,项目团队由 30 人组成。你想看看项目的沟通要求和为促进项目沟通所使用的技术。你可以从哪里获得这些信息?
A. 项目管理计划
B. 信息分布计划
C. 甘特图
D. 沟通管理计划
【单选题】
在项目执行过程中,你被任命为项目经理。项目各项指标都基本在容许范围之内。但是,客户对项目绩效不满意。你应该做的第一件事是什么?
A. 与项目团队一起讨论
B. 重新计算基准
C. 重新商谈合同
D. 与客户见面。
【单选题】
一位项目经理已被任命在一个数据中心安装新的服务器设备。通过一次风险专题会,以下两项风险已被识别,并被评估为发生的可能性高:1.由于关键部件短缺,导致设备延期。2.客户还未开始准备数据中心,导致项目延期。项目经理下一步应该做什么?
A. 启动风险减轻过程
B. 执行蒙特卡洛分析
C. 添加进风险管理计划
D. 启动风险应对计划
【单选题】
某个团队成员同时在几个项目上兼职,他抱怨说自己弄不清楚哪个项目更加重要。应该由谁来决定各项目之间的优先顺序?()
A. 项目发起人
B. 高级管理层
C. 项目经理
D. 项目相关方