刷题
导入试题
【判断题】
国统区第二条战线的形成,表明在不仅在军事战线上,而且在政治战线上,国民党都打了败仗。
A. 对
B. 错
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【判断题】
抗战胜利后,一些民主党派领导人所主张的“中间路线”实质上就是资产阶级共和国方案,是旧民主主义的道路。
A. 对
B. 错
【判断题】
内战爆发后,客观形势决定了人民没有走中间路线的余地,原先主张走第三条道路的各党派都靠近了中国共产党,站到了新民主主义革命的立场上来。
A. 对
B. 错
【判断题】
1949年9月的召开的中国人民政治协商会议,是新中国的创建会议,《共同纲领》起着临时宪法的作用。
A. 对
B. 错
【判断题】
民主党派参加新政协并在新中国参政,标志着民主党派地位的根本变化,它们不再是在野党,成为了中国人民民主专政的参加者。
A. 对
B. 错
【判断题】
人民民主专政的新中国的创建,标志着近代以来中国面临的两大历史任务的基本完成。
A. 对
B. 错
【单选题】
A vSphere content library administrator is attempting to unpublish the content library, but the option is grayed out as shown in the Exhibit. Which statement identifies the reason for not being able to unpublish? ___
A. The content library is optimized for syncing over HTTP.
B. A synchronization operation is in progress with this content library.
C. There are active subscriptions on this content library.
D. Underlying storage for this content library is not accessible.
【单选题】
Assuming a mirrored (RAID-1) object configuration, how many hosts must contribute storage in a non-stretched VMware vSAN cluster to satisfy the “Number of failures to tolerate” policy option?“n” is the desired “Number of failures to tolerate” value for all options.___
A. 2n+2
B. 2n
C. 2n+1
D. 3n
【单选题】
An administrator must change the statistics level for short-term performance monitoring and wants to collect metrics for all counters, excluding minimum and maximum rollup values. What would be the statistics level?___
A. Level 3
B. Level 1
C. Level 2
D. Level 4
【单选题】
In a vSphere environment, two resource pools are created as shown in the Exhibit. Each VM is configured with 1 GB of memory. When the administrator tried to power on VM3, the operation failed. What action in the resource pool settings will allow VM3 to power on successfully?___
A. Deselect Expandable Memory Reservation
B. Increase Memory Reservation
C. Deselect Expandable CPU Reservation
D. Increase the CPU Reservation
【单选题】
Which network is used by vSphere HA when VMware vSAN is enabled?___
A. Management network
B. vSphere Replication network
C. vMotion network
D. VSAN network
【单选题】
Which statement is correct when migrating from a Windows vCenter Server to the vCenter Server Appliance 6.5?___
A. Migration deployments do not migrate local OS users from the source vCenter Server.
B. Migration deployments support DHCP on the source vCenter Server.
C. Migration deployments allow the source vCenter Server to remain powered on afterwards.
D. Migration deployments support custom ports for all services on the source vCenter Server.
【单选题】
How can failback of a recovered virtual machine in vSphere Replication be performed?___
A. No action required, because failback is automatically performed to the source site.
B. Configure a new replication in the reverse direction at the target site.
C. Disable or Stop the virtual machine replication on the source site.
D. Power off and unregister the virtual machine on the target site.
【单选题】
After upgrading the vSphere infrastructure and VMware Tools to version 6.5, the “Upgrade VM Compatibility” option is grayed out in the vSphere Web Client. (See Exhibit.) What must the administrator do to enable the VM compatibility upgrade?___
A. VMware Tools should be upgraded last.
B. Restart the ESXi server.
C. Uninstall VMware Tools.
D. Power off the virtual machine.
【单选题】
What availability mode does vCenter HA provide?___
A. Active-Passive
B. Active-Standby
C. Active-Active
D. Load-balanced
【单选题】
In which scenario will vSphere DRS balance resources when set to Fully Automated?___
A. Hosts with only shared storage
B. Hosts are part of a vSphere HA cluster
C. Power Management is set to Balanced on hosts
D. Hosts with shared or non-shared storage
【单选题】
What VMware technology can be used to move physical servers to the vSphere infrastructure?___
A. VMware vMotion
B. VMware Converter
C. VMware vCenter Server
D. OVF transport
【单选题】
Upgrading vCenter Server with Microsoft SQL database fails with the following error message: The DB User entered does not have the required permissions needed to install and configure vCenter Server with the selected DB. Please correct the following error(s): %sWhat could cause this error?___
A. incorrect ports open on SQL Server
B. incorrect database on the SQL server
C. incorrect compatibility mode on the SQL server
D. incorrect permission on SQL Server database
【单选题】
What is a potential downside of having more than four paths per datastore?___
A. limits the storage protocols
B. increases storage latency for VM
C. limits the path selection policies
D. limits the number of LUNs per host
【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
A. 1
B. 64
C. 3
D. 2
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
【单选题】
What VM Monitoring setting would ensure that the failure interval for a virtual machine is defined as 120 seconds?___
A. High
B. Normal
C. Low
D. Medium
【单选题】
The business managers have asked the IT administrator to ensure configuration compliance in the vSphere infrastructure. The IT administrator wants to use Host Profiles to accomplish this, but is unable to do so. Why is the administrator unable to use Host Profiles?___
A. The infrastructure uses a vSphere Standard license.
B. The infrastructure has servers with various CPU families.
C. The user has only the “Administrator” role.
D. Host Profiles apply only to storage settings.
【单选题】
What is the result of a “Consolidate” action on a virtual machine?___
A. All snapshots on the virtual machines will be deleted.
B. The virtual machine will be reverted to its last snapshot.
C. Redundant delta disks will be combined and deleted.
D. A new snapshot with memory state will be created.
【单选题】
A Telco customer is implementing NFV using vSphere as the virtualization platform. Which feature can help achieve a high packet rate with lower CPU consumption?___
A. Network I/O Control
B. SplitRX
C. ERSPAN
D. LACP
【单选题】
What is the VMware-recommended best practice for Fibre Channel zoning?___
A. soft zoning
B. single-initiator-multiple-target zoning
C. single-initiator zoning
D. single-initiator-single-target zoning
【单选题】
How can a vSphere administrator ensure that a set of virtual machines run on different hosts in a DRS cluster?___
A. Use a VM-Host affinity rule.
B. Add the VMs to a vApp.
C. Use a VM-VM affinity rule.
D. Place the VMs in different folders.
推荐试题
【判断题】
第三套人民币有50元的面额
A. 对
B. 错
【判断题】
国务院反假币工作联席会议是银行业金融机构反假币联络会议的牵头单位
A. 对
B. 错
【判断题】
中华人民共和国的法定货币是人民币。以人民币支付中华人民共和国境内外的一切公共的私人的债务,任何单位和个人不得拒收
A. 对
B. 错
【判断题】
反假币信息系统中的假币造假方式分为伪造与变造两种
A. 对
B. 错
【判断题】
“假币”印章上方为“假币”字样,下方为收缴单位名称
A. 对
B. 错
【判断题】
中国人民银行分支机构和中国人民银行授权的鉴定机构鉴定货币真伪时,应当至少有两名鉴定人员同时参与
A. 对
B. 错
【判断题】
光变油墨面额数字是用横竖线交叉和点线结和构成的花纹使一个完整的图案中隐藏着特定的图纹或数字。按照一定的角度观察,就能看到隐藏的图文或数字
A. 对
B. 错
【判断题】
五分按半额兑换的,兑付二分
A. 对
B. 错
【判断题】
银行业机构应规范使用钞票处理设备,随保设备各项功能正常运行
A. 对
B. 错
【判断题】
根据冠字号码查询结果判定为金融机构付出假币,有假币实物的,应由金融机构按照《中国人民银行假币收缴鉴定管理办法》进行处理,并予以半额赔付
A. 对
B. 错
【判断题】
清分机可识别全部人民币变造币
A. 对
B. 错
【判断题】
对假外币纸币和各种假硬币,应当面以统一格式的专用袋加封,封口处加盖“假币”字样戳记,并在专用袋上标明币种、券别、面额、张(枚)数、冠字号码、收缴人、复核人名章等细项
A. 对
B. 错
【判断题】
根据冠字号码查询系统查询结果判定为付出假币的,如果假币已被其他银行业金融机构收缴或公安机关没收,付款行可不予赔付
A. 对
B. 错
【判断题】
根据世界大多数国家对货币防伪技术的分类,货币防伪通常划分为公众防伪、专业防伪和特种防伪
A. 对
B. 错
【判断题】
冠字号码查询系统模糊检索要求输入完整待查冠字号码后显示唯一冠字号码现钞
A. 对
B. 错
【判断题】
国务院反假货币工作联席会议负责组织、协调全国的反假货币工作
A. 对
B. 错
【判断题】
机械清分指通过自动化清分机具进行现金清分的处理过程
A. 对
B. 错
【判断题】
假币持有人在假币收缴凭证上签字认可后,就不能再申请货币真伪鉴定
A. 对
B. 错
【判断题】
假币资料或样张归还,应将实物与暂借卡片进行核对,无误后在暂借卡片上注明归还日期,并登记假币总分登记簿
A. 对
B. 错
【判断题】
鉴定可疑人民币的真伪,需要综合考查各项防伪特征
A. 对
B. 错
【判断题】
金融机构记录的冠字号码信息,必须隔天传输到冠字号码查询信息系统
A. 对
B. 错
【判断题】
金融机构可按上报假币电子比对文件要求,自主开发数据报送系统
A. 对
B. 错
【判断题】
目前市场上伪造的人民币主要是机制假人民币
A. 对
B. 错
【判断题】
冠字号码查询应由本人申请查询,不得代理查询
A. 对
B. 错
【判断题】
第五套人民币5角硬币色泽为金黄色,直径为20.5毫米,材质为铜芯镀铜合金,硬币外缘为间断丝齿,共有6个丝齿段,每个丝齿段有8个齿距相等的丝齿
A. 对
B. 错
【判断题】
动态鉴别是指自动连续鉴别纸币真假的方式
A. 对
B. 错
【判断题】
钞票有荧光反应的就是假钞
A. 对
B. 错
【判断题】
存取款一体机未加冠字号码记录模块的,可以开启循环功能,加钞前记录冠字号码的参照取款机执行
A. 对
B. 错
【判断题】
金融机构临柜人员在办理残缺、污损人民币纸币兑换业务时,应当面在兑换的残缺人民币票面上加盖带有本行行名的全额或半额戳记
A. 对
B. 错
【判断题】
根据《中国人民银行关于做好反假货币信息系统试运行工作的通知》(银发[2009]374号)文件要求,每季末,假币报送行必须向当地人民银行分支机构发送假币信息电子对比文件
A. 对
B. 错
【判断题】
金融机构应制定预案,防止冠字号码数据信息丢失。建议金融机构与机具厂商签订协议,明确机具数据丢失情况下各方的职责和义务
A. 对
B. 错
【判断题】
接线技术是指钞券在印制过程中,正、背面同一部位分别印有花纹或图案,迎光透视两面花纹或图案完全重合或互补,它是通过胶印一次印刷完成的,具有较强的防伪功能
A. 对
B. 错
【判断题】
金融机构在办理残缺、污损人民币兑换业务时,无需向残缺、污损人民币持有人说明认定的兑换结果
A. 对
B. 错
【判断题】
人民币纸币票面缺少面积在20平方毫米以上不宜流通
A. 对
B. 错
【判断题】
人民银行分支机构应指定专人负责假币接收业务,双人核对假币实物与《银行业机构现金整点中心发现假币解缴单》,打印《假币收缴凭证》(一式两联),印鉴加盖齐全
A. 对
B. 错
【判断题】
为保证假币实物安全,查询人或查询代理人持假币实物申请查询的,应予以封存,并在纸币实物上加盖印章
A. 对
B. 错
【判断题】
要识别真假人民币,首先要知道各种假币的特征
A. 对
B. 错
【判断题】
银行业机构柜台如使用通过两次进钞分别完成鉴伪和清分操作的现金处理设备(业内称作“一口半清分机”),需严格采用两种模式进钞的操作流程
A. 对
B. 错
【判断题】
银行业机构应规范使用钞票处理设备,确保设备各项功能正常运行保设备各项功能正常运行
A. 对
B. 错
【判断题】
银行业机构支付的10元及以上面额必须经过机械清分
A. 对
B. 错
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用