【多选题】
Which two statements describe why a vSphere DRS cluster would report load imbalance? (Choose two.)___
A. The configured migration threshold is too high.
B. The configured migration threshold is too low.
C. DRS is configured for Partially Automated.
D. Enhanced vMotion Compatibility (EVC) is enabled.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AC
解析
暂无解析
相关试题
【多选题】
A vSphere Administrator must ensure that vCenter Server service is running in a domain user account rather than Local System Account. To accomplish this, the user account should have which two permissions? (Choose two.)___
A. Log on as a service.
B. Act as part of the operating system.
C. Log on as a batch job.
D. Log on locally.
【多选题】
A virtual machine fails to power on after being deployed from a template. What two remediation steps could correct this issue? (Choose two.)___
A. Increase CPU reservation
B. Decrease memory reservation
C. Increase memory reservation
D. Increase datastore capacity
E. Decrease CPU reservation
【多选题】
Which three directories are available under the vcsa-cli-installer folder of the vCenter Server Appliance installation media? (Choose three.)___
A. \mac
B. \ovftool
C. \migration-assistant
D. \win32
E. \lin64
【多选题】
What are three considerations when booting ESXihost from SAN software FCoE? (Choose three.)___
A. The VMware_FCoE_vSwitch that the installer automatically created cannot be changed.
B. Boot LUN cannot be shared with other hosts even on shared storage.
C. Multipathing is not supported at pre-boot.
D. Software FCoE boot configuration cannot be changed from within
E. SXi.
【多选题】
Which two choices are applicable to vSphere Availability? (Choose two.)___
A. Heartbeat Datastores
B. VM Startup/Shutdoown
C. Power Management
D. Admission Control
【多选题】
A user is a member of groups A and B. -VM10 and VM20 are in VM Folder. -Group A is assigned permission “Read-only” on VM Folder. What two configurations will allow the user to edit the settings for only VM10? (Choose two.)___
A. Assign group B permission “virtual machine power user” to VM10.
B. Assign group B permission “virtual machine console user” to VM10.
C. Assign group A permission “virtual machine console user” to VM10.
D. Assign group A permission “virtual machine power user” to VM10.
【多选题】
Which two new vSphere 6.5 features enable an Administrator to locate configuration options when creating or editing host profiles more easily than in previous versions? (Choose two.)___
A. Add the configuration option to favorites.
B. Navigate the option tree.
C. Search for the configuration option.
D. Copy the configuration option from a different profile.
【多选题】
What are the two valid storage controller types for VMs on ESXi 6.5? (Choose two.)___
A. FCoE
B. SATA
C. NVMe
D. iSCSI
【多选题】
Which two options can optimize conversion with VMware Converter? (Choose two.)___
A. Disable real-time antivirus scanners.
B. Remove the source from Active Directory.
C. Remove third-party device drivers.
D. Exclude diagnostic partitions from conversion.
E. Disable Volume Shadow Copy (VSS).
【多选题】
vSphere Availability considers which two factors for virtual machine restarts? (Choose two.)___
A. Host Isolation Response
B. file accessibility
C. NUMA node size
D. resource reservations
【多选题】
Which two virtual NICs support Wake-on-Lan to resume a virtual machine that is in standby mode? (Choose two)___
A. Flexible
B. E1000E
C. E1000
D. vmxnet 3
【多选题】
Which two logs should be examined to troubleshoot a Windows vCenter Server upgrade failure? (Choose two.)___
A. vminst.log
B. vim-um-msi.log
C. firstboot.log
D. pkgmgr.log
【多选题】
Which are two supported storage primitives for VAAI NAS? (Choose two.)___
A. Full File Clone
B. Reserve Space
C. hardware assisted locking
D. block zeroing
【多选题】
Which two parameters must be configured for Windows in-guest disk mirroring? (Choose two.)___
A. scsi#.returnNoConnectDuringAPD = “FALSE”
B. scsi#.terminateVMOnPDL = “TRUE”
C. scsi#.returnBusyOnNoConnectStatus = “FALSE”
D. scsi#.returnNoConnectDuringAPD = “TRUE”
【多选题】
Which two items are required to enable NPIV in a virtual machine? (Choose two.)___
A. use of physical RDMs
B. physical HBA support
C. use of virtual disks
D. hardware version 11 or higher
【多选题】
A vSphere Administrator has VM Component Protection (VMCP) enabled, but the VM was not restarted when one of the VMFS datastores experienced an All Paths Down (APD) failure. What two scenarios would explain why the virtual machine was not restarted? (Choose two.)___
A. VM Monitoring is required in order for VMCP to failover during an APD event.
B. VMware Tools is not installed on the guest operating system for the VM.
C. Insufficient Capacity is available on the failover ESXi hosts.
D. The APD failure was corrected before the VM could be restarted.
【多选题】
What are two requirements in order to restore a Resource Pool Tree from a snapshot? (Choose two.)___
A. vSphere DRS must be turned on.
B. A restore can only be performed on a vSphere DRS cluster within the original vCenter Server.
C. vSphere
D. RS must be turned off.
【多选题】
Which three vSphere features are compatible with vSphere Replication? (Choose three.)___
A. vSphere High Availability
B. vSphere Fault Tolerance
C. vSphere Storage
D. RS
【多选题】
What two VMware Remote Console Options can be defined in the virtual machine settings? (Choose two.)___
A. Boot Delay
B. Maximum number of sessions
C. Guest OS lock
D. Total video memory
【多选题】
VMware Converter can import a powered off virtual machine from which two virtual machine platforms?(Choose two.)___
A. Microsoft Hyper-V
B. Citrix Xen
C. VMware Workstation
D. Linux with KVM
【多选题】
Which two options allow storage space reclamation? (Choose two.)___
A. Use VMFS6 datastores.
B. Use esxcli storage vmfs unmap.
C. Use the SAN console (management tool).
D. Use the vSphere Web Client.
【多选题】
An administrator must reprovision 25 hosts with a new image profile that he has created. Which two methods can the administrator use to change the image profile? (Choose two.)___
A. From the vSphere Web client home page, select the Deploy Rules tab in the Auto Deploy section.
B. Run the Copy-Deploy Rule and specify the Replace Item parameter with Power CLI.
C. From the vSphere Web client home page, select the Assign Rules tab in the Auto
D. eploy section.
【多选题】
What are three parameters for traffic filtering or marking? (Choose three.)___
A. Protocol
B. Traffic Direction
C. DSCP value
D. virtual Port ID
【多选题】
The vSphere administrator must change the path selection policy (PSP) to comply with best practices. Which two interfaces can be used to change the PSP? (Choose two.)___
A. ESXi shell
B. vSphere Client
C. ESXi host client
D. vSphere Web Client
【多选题】
In what two ways can Storage DRS load balance virtual machines? (Choose two.)___
A. anti-affinity rules
B. virtual storage controller
C. guest OS family
D. I/O latency
【多选题】
What two reasons can explain why a host cannot be removed from a vSphere Distributed Switch? (Choose two.)___
A. There are virtual machine network adapters connected to the switch.
B. There are blocked ports on the switch.
C. There are LACP LAGs configured on the switch.
D. There are VMkernel network adapters connected to the switch.
【多选题】
Which three requirements are true for the vCenter Server HA network? (Choose three.)___
A. Network latency between all nodes must be less than 10 milliseconds.
B. IP addresses for all nodes must be static.
C. HA network IP addresses for all nodes can be on different subnets.
D. IP addresses must be on the same network as the management network.
E. A default gateway must be configured.
【多选题】
Which two statements correctly describe Normal Lockdown Mode? (Choose two.)___
A. ESXi Shell and SSH services are independent of lockdown mode.
B. In normal lockdown mode the DCUI service is stopped.
C. ESXi Shell and SSH services are dependent of lockdown mode and cannot be configured.
D. In normal lockdown mode the DCUI service is running.
【多选题】
The Health check feature in the vSphere Distributed Switch helps troubleshoot network connectivity. What three checks does this feature perform? (Choose three.)___
A. Network Utilization
B. MTU
C. Teaming and Failover
D. VLAN
【多选题】
What are the three types of nodes in a vCenterServer HA cluster? (Choose three.)___
A. Master
B. Replica
C. Witness
D. Active
E. Passive
【多选题】
What are two consequences of turning off vSphere DRS on a cluster? (Choose two.)___
A. vMotion capability will be lost.
B. Resource pools will be lost.
C. vApps will be lost.
D. Affinity rules will be lost.
【多选题】
Which two protocols can be used to back up vCenter Server Appliance Instance? (Choose two.)___
A. iSCSI
B. HTTPS
C. FTP
D. NFS
【多选题】
What are two requirements to enable EVC in a vSphere DRS cluster? (Choose two.)___
A. CPU must be in the same family and of the same speed.
B. CPUs must be from the same vendor.
C. EVC must use the lowest possible baseline supported by the hardware.
D. No VMs may be running in the cluster.
【多选题】
In Advanced settings on a vSphere host, Security.Password Quality Control set as retry=3 min=disabled, disabled, disabled, 7, 7 . Which two passwords are valid? (Choose two.)___
A. xQaT3#A
B. P@ssw0rd
C. xQaTEh2
D. Xqat3h!
E. xQaTEhb!
【多选题】
To support Auto-Deploy, which two network requirements must be met? (Choose two.)___
A. IP multicast support
B. IPv4 or IPv6
C. PXE boot
D. 10 GbE networking
【多选题】
A vSphere administrator receives reports of a virtual machine performing extremely slowly, with CPU usage being the suspected bottleneck. After reviewing esxtop (view the Exhibit), which two scenarios could cause a performance problem for the virtual machine? (Choose two.)___
A. A processor affinity is configured for the virtual machine.
B. A virtual machine CPU limit is configured.
C. A virtual machine reservation is configured.
D. A virtual machine memory limit is configured.
E. A virtual machine CPU reservation is configured.
【多选题】
Which three source object types are available for subscription when creating a subscribed content library in vSphere 6.5? (Choose three.)___
A. vSphere 6 library
B. HTTP server
C. vCD 5.5 catalog
D. CIFS repository
E. 3rd-party library
【多选题】
药学服务的主要实施内容正确的是___
A. 医、药、护有机结合,共同承担医疗责任
B. 药学服务只是针对患者个人
C. 协助医护人员制定和实施药物治疗方案
D. 定期对药物的使用和管理进行科学评估
E. 主要是积极参与疾病的治疗,预防和保健则与药学服务关系不大
【多选题】
药学服务的对象包括___
A. 医生
B. 患者及其家属
C. 护士
D. 公众
E. 健康人群
【多选题】
药历的作用有___
A. 客观记录药师为保证患者合理用药所采取的措施
B. 药师解决临床相关问题的技术档案
C. 开展个体化药物治疗的重要依据
D. 保证患者用药安全、经济、有效
E. 便于药师开展药学服务
推荐试题
【单选题】
AMB60某项目主要依靠外部组织的力量来完成,其中一个合同的期限预计为3年,价格可能高达500万美元。买方想要采用总价合同,但又担心潜在卖方在报价中计入过高的通货膨胀应急储备。买方应该选择什么合同?___
A. 固定总价合同
B. 总价加激励费用合同
C. 总价加奖励费用合同
D. 总价加经济价格调整合同
【单选题】
AMB61在项目中途,一名团队成员告知项目经理,鉴于项目范围的复杂性,估算的项目进度不充分,项目经理首先应该怎么做?___
A. 管理风险并实施风险响应活动
B. 分析报告以确定最佳的行动措施
C. 收集并记录经验教训
D. 执行详细的分析,如需要的话可提交变更请求
【单选题】
AMB62在演示和审查会议期间,进度报告显示一个敏捷项目脱离正轨,项目经理感到很惊讶,因为所有工作都是经过有目的性的选择和排序以满足更高层级的目标。若要预防这种沟通不畅的问题,项目经理应该事先做什么?___
A. 鼓励团队自行组织并项目提供支持。
B. 创建一份应急储备。
C. 让团队参与记录敏捷进度报告系统。
D. 培训并指导团队使用敏捷方法。
【单选题】
AMB63一个项目都有特定的服务水平协议,以保证对客户的服务质量。项目经理应使用什么样的工具,来确定该服务的稳定性,以及他的可预测性?___
A. 控制图
B. 帕累托图
C. 流程图
D. 标杆对照
【单选题】
AMB64项目团队成员担心一项批准的变更请求会增加范围,延长时间线,但是却不增加预算。项目经理应该怎么做?___
A. 寻求可选替代方案,在现有预算范围内管理工作。
B. 要求管理层增加预算。
C. 激励团队面对挑战。
D. 拒绝批准的变更请求。
【单选题】
AMB65项目经理向项目发起人提供增加一个新功能所需的预计活动费用。项目经理参考 WBS 和历史数据后,预计这项活动实际上需要20天,在最坏情况下的需要32天,在最好情况下需要14天。如果每天的费用为$140元,则增加这项新功能的预计费用是多少?___
A. $2,520
B. $2,940
C. $3,080
D. $3,640
【单选题】
AMB66在于项目团队成员的非正式谈话中,项目经理发现某个关键部分的供应商在执行一个已获批准的产品变更时有问题。项目经理接下来应执行下列哪一项?___
A. 实施对供应商的质量审计
B. 安排一次变更控制会议
C. 审查供应商的工作绩效
D. 与供应商的高级经理谈话
【单选题】
AMB67连续的降雨导致山洪暴发,道路被冲毁。如果未来一段时间内继续降雨,道路抢修需要20天;如果晴天,10天就可以修好;不过,从未来一段的天气预报情况推测,最有可能12天完成。完成道路抢修的期望工期为?___
A. 13天
B. 15天
C. 12天
D. 14天
【单选题】
AMB68项目的客户告诉项目经理他已经没钱了,不能再支付该项目。项目经理应该首先做什么?___
A. 推迟进度中的多数项目工作,以给客户时间去寻找资金
B. 进入行政收尾
C. 停止工作
D. 解散一部分项目团队
【单选题】
AMB69有一部分项目工作从外部资源采购,项目团队制定采购计划,并向多个供应商发出建议邀请书,团队从潜在供应商那里获得关于工作的询问,为向潜在供应商提供响应,项目团队应该怎么做?___
A. 向每一位供应商发送单独回复
B. 在项目团队中为每一位供应商指定单个联系人
C. 修订建议邀请书,将对所有问题的回复包含在内,并分发给所有供应商
D. 召开投标人会议,澄清所有供应商的全部问题
【单选题】
AMB70项目接近完工,团队成员向项目经理报告一个会影响到重要期限的问题,每周状态报告将在第二天发送主要相关方,项目经理下一步该怎么做?___
A. 更新问题日志,通知发起人并使用问题升级流程,问相关方报告可能延迟
B. 在下一次状态周报告中通知相关方,与他们讨论可能的解决方案,并请求预算和进度延期
C. 核实这个问题是否包含在风险计划中,如不在,则应该将其包含在内,并编制风险减轻计划
D. 更新问题日志,将可以帮助解决问题的所有人员包含在内,并与相关方就此问题进行沟通
【单选题】
AMB71项目选择委员必须在项目A和项目B之间做出选择,项目A的投资回报期为21个月,项目B的成本为175000美元,第一年的预期正现金流为75000美元,之后每季度的正现金流为 50000美元,项目经理应选择哪一个?___
A. 项目 A 或项目 B,因为两个项目投资回报期一样
B. 项目 B,因为项目 A 的投资回报期更长
C. 项目 A,因为项目 B 的投资回报期更长
D. 项目 B,因为项目 B 的投资回报期更短
【单选题】
AMB72在识别和了解项目风险过程中,项目团队希望通过图形化方式表现风险。这些关键元素包括决策、不确定元素、因果关系和目标。团队应使用哪种类型的风险图解技术?___
A. 章程图
B. 帕累托图
C. 德尔菲图
D. 影响图
【单选题】
AMB73项目经理收到一封正式函件,通知由于组织结构内部调整,某一重要相关方不再作为主抓该项目的负责人,而是作为咨询顾问继续参与项目工作。得到这一信息后,项目经理应该如何处理? ___
A. 修改项目文件和项目管理计划
B. 通知团队成员,以后不需要再给该相关方发送报告
C. 私下沟通,核实该消息的可靠性
D. 要求项目执行组织解释做出这种调整的理由
【单选题】
AMB74在一个工程项目中,项目经理应用了在之前更为复杂项目中成功应用的项目管理方法。项目团队成员抱怨说这类项目的每份文件同行评审需要花费太多的精力。若要确保质量成本满足项目特征,项目经理应该怎么做?___
A. 省略同行评审
B. 查询质量测量指标
C. 执行质量审查
D. 在计划中考虑质量成本
【单选题】
AMB75在某个软件开发项目中,卖方已经按照合同要求圆满地完成了项目工作,这时,买方又要求在合同中添加一项新工作。鉴于上述情况,卖方应该如何做? ___
A. 开始合同收尾,并要求就新工作签订新合同
B. 同意添加新工作,但要求用成本补偿的方式来做
C. 拒绝做新工作,因为合同已经完成
D. 立即开展新工作,以便维护与买方的良好关系
【单选题】
AMB76进行自制或外购分析后,项目经理将已经包含工作分解结构(WBS)中的内容进行外包,项目经理应该采取下列哪一项措施?___
A. 将需要外包的可交付成果从WBS中移除。
B. 将需要外包的可交付成果保留在 WBS 中。
C. 创建另一个 WBS,仅包含将需要外包的可交付成果。
D. 等到选定外包供应商后才对 WBS 进行更改
【单选题】
AMB77一个制造项目预期每周将交付 100,000 件产品,周缺陷率不大于 0.01%。在过去四周内的缺陷率却是 0.3%、0.1%、0.1%和 0.45%。项目经理集合了一支专家队,判定原材料不满足质量规范。项目团队决定将有必要修订原材料检查过程。项目经理应如何处理这些信息?___
A. 执行优势、劣势、机会与威胁(SWOT)分析。
B. 提出变更请求。
C. 请求额外的质量资源。
D. 开展一致成本研究。
【单选题】
AMB78在合同执行过程中,买方的一名团队成员要求卖方编制并提交了一份合同规定之外的特殊的项目工作绩效报告。卖方为此向买方提出了额外费用索赔,以弥补它编制报告的支出。针对这种情况,买方的采购管理员应该怎么做?___
A. 拒绝卖方的索赔要求,并调查团队成员为什么索要这份报告
B. 请团队成员提出变更请求,以便把该报告加进合同中
C. 向卖方支付费用补偿,并采取合理措施
D. 防止团队成员以后再索要类似报告
【单选题】
AMB79在项目执行过程中,指定供应商的仓库发生火灾,导致无法按计划为项目提供所需产品。为了不影响项目顺利执行,项目经理决定从原定备用供应商那里采购所需产品。项目经理的做法属于?___
A. 执行权变措施
B. 执行弹回计划
C. 执行应急计划
D. 执行风险转移
【单选题】
AMB80在管理当前项目的时候,非常重要的一点是要运用从以往项目上积累的经验教训来提高项目管理的水平。因此在结束项目或阶段程序中,回顾下列哪项是比较重要的?___
A. 曾发生过的中等程度的风险
B. 风险核对单
C. 工作分解结构词典
D. 团队成员简历
【单选题】
AMB81项目经理了解到主题专家(SME)正在考虑离开公司,该专家资源在其主题领域拥有深厚知识,很难被替代,为确保主题专家能在整个项目期间留在项目中,项目经理与主题专家的经理讨论可能的措施,这些措施应记录在哪些文件中?___
A. 人力资源计划
B. 风险登记册
C. 风险管理计划
D. 组织分解结构
【单选题】
AMB82项目经理注意到正在构建的系统存在多个质量问题,项目经理应该使用什么来跟踪这些问题的解决方案?___
A. 变更控制过程
B. 质量分析
C. 风险审查
D. 问题日志
【单选题】
AMB83定期项目评审过程中,项目经理发现挣值EV为50,000美元,而计划价值PV为30,000美元。此外,与预先估算的15,000美元相比,已经花费了35,000 美元。下列哪一种说法描述了项目的当前状态?___
A. 处于正常轨道,并与风险管理计划保持一致
B. 落后于进度计划,且由于许多变量可能偏移
C. 由于有效利用资源,处于正常轨道
D. 由于赶工,超前于进度
【单选题】
AMB84项目团队正在讨论。幸运的是项目经理已经建立了奖励机制和团队建设,有助于鼓励团队进一步合作。团队最近讨论的一件事是他们是否应自己完成一工作包还是外包给其他人。他们现在肯定是在采购过程的哪个阶段?___
A. 控制采购
B. 规划采购管理
C. 实施采购
D. 结束采购
【单选题】
AMB85你决定向以前经常为你的公司服务的一家供货商外包合同。该供货商在履行时间表和成本效益方面记录良好,而且与你建立了良好的工作关系。你现在的项目虽然与以前的不同,但是与该供货商完成其它工作类似。在这种情况下,你应该订立什么类型的合同:___
A. 固定价格,附加币值调整
B. 固定酬金(固定目标)
C. 固定价格
D. 成本加酬金
【单选题】
AMB86项目经理注意到有一个部门完成每个项目活动花费的时间都比计划长。到目前为止,这些活动/工作包都不在关键路径上,也没有影响到已经发生的关键链计划编制。项目经理担心关键链会出问题,因为接下来的5个关键路径活动中有4个要由该部门完成。项目经理打了3个电话,最后总算能和部门经理说上话了,项目经理想知道发生了什么。对话进行得很慢,因为两个人说的是不一样的母语,他们试着用法语—共同语言—讲话。为了使谈话更容易,项目经理总是让部门经理再说一遍。部门经理说,他的下属遵照一项公司政策,该政策要求2级测试。谈话中,部门经理还作出一些评论,这让项目经理相信该政策会增加工作量。这已经是该项目经理第4次听到这样的评论了。他该怎么办?___
A. 编制更好的沟通管理计划,要求该项目使用一种语言,并安排翻译随时候命
B. 联系部门中其他的能更流利的说项目经理母语的成员,来确认部门经理的意见
C. 确认接下来的活动是否要重新估算
D. 通过不断的改进存在问题的政策,提高执行机构的效率
【单选题】
AMB87项目经理发现关键路径上一项活动的开始到结束依赖关系遗漏了。项目进度计划已经与客户沟通,若要避免这个问题,项目经理应该事先做什么?___
A. 审查工作分析结构
B. 进行进度网络分析
C. 制定风险管理计划
D. 进行挣值分析
【单选题】
AMB88在一个软件开发项目的规划阶段,如果比承诺交付时间提前两个月交付产品,公司将获得一份奖励,产品开发的项目经理让编程人员在需求和设计完成之前开始代码编写。这种情况下,项目经理在应用哪项进度技术?___
A. 赶工
B. 快速执行
C. 快速跟进
D. 分阶段执行
【单选题】
AMB89项目经理被批准执行一个价值1200万美元为期三年的项目,6个月后,25%项目已完成,项目团队开支为400万美元。计算完进度绩效指数和成本绩效指数后,下一步应该做什么?___
A. 要求更多资金
B. 执行偏差分析
C. 制定绩效预测
D. 提交变更请求
【单选题】
AMB90项目经理与主题专家SME一起估算项目任务。主题专家认为某项活动最可能花45小时完成。但是,在项目团队会议上,相同的活动估计需要花70小时。而有些团队成员认为这项活动能够在32小时内完成。 项目经理应该怎么估算这项活动?___
A. 32小时
B. 45小时
C. 47小时
D. 70小时
【单选题】
AMB91在项目上,项目经理带领团队运用头脑风暴法完成了风险识别工作。其中有一个风险,大家都认为发生的可能性很小,但万一发生会有很严重的影响。对这个风险,应该采用什么方法加以监控? ___
A. 帕累托图
B. 控制图
C. 散点图
D. 鱼骨图
【单选题】
AMB92项目经理要求风险经理开展每月的定量风险分析。风险经理应该提交什么?___
A. 蒙特卡洛累积图
B. 风险重新评估
C. 概率和影响矩阵
D. 根据概率和影响等级来识别风险
【单选题】
AMB93项目A已经交付给客户A,而且开始开展收尾活动. 项目团队将会转到客户B的项目上工作. 销售经理要求项目经理提供项目A的售后支持. 项目经理应执行下列哪一项?___
A. 将项目团队转移到项目B上,开始新的启动活动.
B. 建议销售经理获得新的资源
C. 确保项目A的特定知识已获收集,并移交组织.
D. 拒绝销售经理的请求,并查阅合同.
【单选题】
AMB94在一个最近的项目状态评审会议上,一名团队成员对其他成员非常不满,而且贬低别人在团队中的地位,这个人属于下列哪项提及的破坏性团队角色?___
A. 寻求赞誉者
B. 阻挡者
C. 攻击者
D. 独断者
【单选题】
AMB95一家公司正在执行一个关键项目,而该项目可能极大影响到公司的收入。首席执行官非常关注项目成功,并承诺分配所有必要资源。该首席执行官的参与程度应如何分类?___
A. 管理
B. 领导
C. 参与
D. 支持
【单选题】
AMB96一家公司正在建设一栋新建筑,该建筑与两年前建造的另一栋建筑具有相同特点,项目发起人需要审查新项目的现金流,以避免上一个项目发生的问题。项目经理下一步应该怎么做?___
A. 审查上一份项目章程
B. 检查上一个项目的经验教训
C. 制定新的商业论证
D. 与上一个项目的项目经理沟通
【单选题】
AMB97你刚被指派负责某项目,该项目正处于项目计划阶段风险管理团队负责人向你报告已完成风险识别工作,该负责人对项目存在很多风险表示很担心,为了有效地管理项目风险,项目经理下一步的工作将如何开展? ___
A. 通过风险分析确定哪些风险最值得管理
B. 为已识别的风险编制有效的应对计划
C. 开展风险分析工作,进一步了解风险
D. 为各项风险指定责任人
【单选题】
AMB98一个项目的规模已经大到由指导委员会取代单一的项目发起人,项目经理应该怎么做来适应这个新发展?___
A. 认识到相关方结构发生了变化,并量身定制与这个团队的沟通
B. 按照最初的计划继续工作,同时认识到该项目现在包括其他相关方
C. 为团队组织一次新的指导委员会一起召开的会议,继续进行项目工作
D. 与新的委员会分享当前的状态报告
【单选题】
AMB99在项目执行过程中,项目经理评估客户添加更多质量检查请求,由于在初步测试中发现一些缺陷,产品经理对此表示赞同,然而,项目团队却不认为这将有助于实现项目目标,为确保质量,项目经理应该怎么做?___
A. 修订过程改进计划
B. 分析工作绩效信息
C. 使用七种基本质量工具
D. 更新质量管理计划
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用